UMTRA Project Technical Assistance Contractor Quality Assurance Implementation Plan for Surface and Ground Water, Revision 2

UMTRA Project Technical Assistance Contractor Quality Assurance Implementation Plan for Surface and Ground Water, Revision 2
Author:
Publisher:
Total Pages: 40
Release: 1995
Genre:
ISBN:

Download UMTRA Project Technical Assistance Contractor Quality Assurance Implementation Plan for Surface and Ground Water, Revision 2 Book in PDF, Epub and Kindle

This document contains the Technical Assistance Contractor (TAC) Quality Assurance Implementation Plan (QAIP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project. The QAIP outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QA program is designed to use monitoring, audit, and surveillance activities as management tools to ensure that UMTRA Project activities are carried out in amanner to protect public health and safety, promote the success of the UMTRA Project, and meet or exceed contract requirements.

UMTRA Project Technical Assistance Contractor Quality Assurance Implementation Plan

UMTRA Project Technical Assistance Contractor Quality Assurance Implementation Plan
Author:
Publisher:
Total Pages: 45
Release: 1994
Genre:
ISBN:

Download UMTRA Project Technical Assistance Contractor Quality Assurance Implementation Plan Book in PDF, Epub and Kindle

The Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance contractor (TAC) Quality Assurance Implementation Plan (QAIP) outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QAIP is subordinate to the latest issue of the UMTRA Project TAC Quality Assurance Program Plan (QAPP) (DOE, 1993a), which was developed using US Department of Energy (DOE) Order 5700.6C quality assurance (QA) criteria. The QAIP addresses technical aspects of the TAC UMTRA Project surface and ground water programs. All QA issues in the QAIP shall comply with requirements contained in the TAC QAPP (DOE, 1933a). Because industry standards for data acquisition and data control are not addressed in DOE Order 5700.6C, the QAIP has been formatted to the 14 US Environmental Protection Agency (EPA) Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) QA requirements. DOE Order 5700.6C criteria that are not contained in the CERCLA requirements are added to the QAIP as additional requirements in Sections 15.0 through 18.0. Project documents that contain CERCLA requirements and 5700.6 criteria shall be referenced in this document to avoid duplication. Referenced documents are not included in this QAIP but are available through the UMTRA Project Document Control Center.

Energy Research Abstracts

Energy Research Abstracts
Author:
Publisher:
Total Pages: 782
Release: 1995
Genre: Power resources
ISBN:

Download Energy Research Abstracts Book in PDF, Epub and Kindle

Quality Assurance Project Plan for the UMTRA Technical Assistance Contractor Hydrochemistry Facility. Final Report

Quality Assurance Project Plan for the UMTRA Technical Assistance Contractor Hydrochemistry Facility. Final Report
Author:
Publisher:
Total Pages: 32
Release: 1993
Genre:
ISBN:

Download Quality Assurance Project Plan for the UMTRA Technical Assistance Contractor Hydrochemistry Facility. Final Report Book in PDF, Epub and Kindle

The Uranium Mill Tailings Remedial Action (UMTRA) hydrochemistry facility is used to perform a limited but important set of services for the UMTRA Project. Routine services include support of field-based hydrological and geochemical operations and water sampling activities. Less commonly, the hydrology and geochemistry staff undertake special studies and site characterization studies at this facility. It is also used to train hydrologists, geochemists, and groundwater sampling crews. A review of this Quality Assurance Project Plan (QAPP) shall be accomplished once each calendar year. This review will be targeted to be accomplished not sooner than 6 months and not later than 18 months after the last review.

Radioactive Waste Management

Radioactive Waste Management
Author:
Publisher:
Total Pages: 726
Release: 1981
Genre: Radioactive waste disposal
ISBN:

Download Radioactive Waste Management Book in PDF, Epub and Kindle

Technical Assistance Contractor Management Plan. Revision 1

Technical Assistance Contractor Management Plan. Revision 1
Author:
Publisher:
Total Pages: 90
Release: 1995
Genre:
ISBN:

Download Technical Assistance Contractor Management Plan. Revision 1 Book in PDF, Epub and Kindle

The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) as the prime contractor and three teaming partner subcontractors: Roy F. Weston, Inc. (RFW), AGRA Earth and Environmental, Inc. (AGRA), and Geraghty and Miller, Inc. (G and M). The TAC contract's scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both Surface and Ground Water Projects. The TAC team supports the DOE in completing surface remedial action and initiating ground water remediation work for start-up, characterization, compliance planning, design, construction oversight, and remedial operations. The TAC provides the DOE UMTRA Project Team with a dedicated management, scientific, and technical resource base in Albuquerque, New Mexico, which is supplemented by corporate resources. A carefully developed and maintained staff of technical experts is available to assess, analyze, develop, and execute cost-effective solutions to the demanding technical and institutional problems presented by the UMTRA Project.