The Impact of Long-Term Aircraft Carrier Maintenance Scheduling on the Fleet Readiness Plan

The Impact of Long-Term Aircraft Carrier Maintenance Scheduling on the Fleet Readiness Plan
Author: Matthew H. Hall
Publisher:
Total Pages: 87
Release: 2004-09-01
Genre:
ISBN: 9781423522393

Download The Impact of Long-Term Aircraft Carrier Maintenance Scheduling on the Fleet Readiness Plan Book in PDF, Epub and Kindle

Maintaining the Fleet Readiness Plan (FRP) construct of six aircraft carriers available within 30 days, plus two additional carriers available within 90 days is a difficult task. Maintenance requirements on carriers alone make satisfying the FRP a challenging scheduling problem. We develop a carrier maintenance scheduling model with a goal to meet, as best as possible, the FRP requirements over a ten-year period, while obeying simple maintenance facility constraints. This model allows us to anticipate gaps in coverage and also quantitatively assess the benefit, or burden, of resizing the fleet. We conclude that by increasing the average cycle time for a Carrier Strike Group (CSG) to 27 months we can meet the FRP requirements continuously after an initial maintenance adjustment period of 62 months.

Impacts of the Fleet Response Plan on Surface Combatant Maintenance

Impacts of the Fleet Response Plan on Surface Combatant Maintenance
Author: Roland J. Yardley
Publisher: Rand Corporation
Total Pages: 72
Release: 2006
Genre: Business & Economics
ISBN: 0833039431

Download Impacts of the Fleet Response Plan on Surface Combatant Maintenance Book in PDF, Epub and Kindle

To achieve a more responsive and more readily deployable fleet of surface combatants, the Navy adopted the Fleet Response Plan (FRP) in 2003 to replace its traditional ship maintenance and readiness cycle. The goal of the FRP is to have non-deployed ships achieve a high level of readiness earlier and to maintain high readiness longer so that they can deploy on short notice. However, a challenge of implementing the FRP is establishing the processes and procedures, as well as a ready industrial base, to facilitate maintenance planning and execution to meet the now unpredictable FRP surge requirements and maintenance demands. By concentrating specifically on the DDG-51 class of destroyers, the authors of this report look at the effects the FRP has had thus far and determine whether maintenance resources are meeting maintenance demands and whether related industry resources have been coordinated effectively. Overall, the authors determine that the initiative appears to have promising effects but that more time will be needed to assess maintenance supply and demand apart from the increase of funding tied to military operations post-September 11, 2001.

Optimal Long-Term Aircraft Carrier Deployment Planning with Synchronous Depot Level Maintenance Scheduling

Optimal Long-Term Aircraft Carrier Deployment Planning with Synchronous Depot Level Maintenance Scheduling
Author: Mehmet Ayik
Publisher:
Total Pages: 116
Release: 1998-03-01
Genre:
ISBN: 9781423562047

Download Optimal Long-Term Aircraft Carrier Deployment Planning with Synchronous Depot Level Maintenance Scheduling Book in PDF, Epub and Kindle

Forward deployment of Navy aircraft carrier battle groups is a primary means for the United States to achieve overseas interests. The Navy maintains the forward presence of aircraft carriers in three major Areas of Responsibility (AORs): the Mediterranean Sea, the Persian Gulf, and the Western Pacific. Considering the cost of carrier operations and the desire to maximize coverage of the AORs, planning deployments for the carriers not only significantly affects the achievement of U.S. defense strategy, but also impacts the Navy financially. Previous studies have maximized the deployment of aircraft carriers to the AORs while strictly adhering to the fixed, long-range maintenance schedules published by the Planning and Engineering for Repairs and Alterations Activity for Aircraft Carriers (PERA CV). This thesis optimizes aircraft carrier deployment planning while shifting the pre-scheduled maintenance availabilities well within limits allowed by the Chief of Naval Operations (CNO). This synchronous planning of deployments and major maintenance yields at least 15% more planned coverage in the AORs with the existing carrier fleet Such an increase had heretofore been thought to require three additional aircraft carriers.

A Methodology for Estimating the Effect of Aircraft Carrier Operational Cycles on the Maintenance Industrial Base

A Methodology for Estimating the Effect of Aircraft Carrier Operational Cycles on the Maintenance Industrial Base
Author: Roland J. Yardley
Publisher: Rand Corporation
Total Pages: 106
Release: 2007
Genre: Political Science
ISBN: 0833041827

Download A Methodology for Estimating the Effect of Aircraft Carrier Operational Cycles on the Maintenance Industrial Base Book in PDF, Epub and Kindle

The Fleet Response Plan is a U.S. Navy program to enhance the operational availability of the aircraft carrier fleet. This report describes program modeling that varies the time between depot availabilities and the size of the depot work packages, to estimate its effect on the maintenance industrial base and the operational availability of the aircraft carrier fleet.

Increasing Aircraft Carrier Forward Presence

Increasing Aircraft Carrier Forward Presence
Author: Roland J. Yardley
Publisher: Rand Corporation
Total Pages: 91
Release: 2008-04-16
Genre: Political Science
ISBN: 0833045954

Download Increasing Aircraft Carrier Forward Presence Book in PDF, Epub and Kindle

The U.S. Navy's aircraft carrier fleet must meet the forward presence requirements of theater commanders. With a decreasing fleet size, planners must balance the timing of maintenance, training, and deployment with presence and surge demands. Evaluating multiple one- and two-deployment scenarios per cycle, RAND examines the feasibility of different cycle lengths, their effect on carrier forward presence, and their impact on shipyard workloads.

Military Readiness

Military Readiness
Author: Janet A. St. Laurent
Publisher: DIANE Publishing
Total Pages: 38
Release: 2008-05
Genre: Technology & Engineering
ISBN: 1437900267

Download Military Readiness Book in PDF, Epub and Kindle

The Navy initiated its Fleet Response Plan (FRP) in March 2003 to meet the new demands of the 21st cent. security environ. FRP is intended to more rapidly prepare & then sustain readiness in ships & squadrons. This new readiness approach will enable its forces to provide engagement in forward areas, as well as surge a greater number of ships on short notice. This goal can be achieved without increasing its operations & maint. budget of $40 billion for each of the next 5 years. But, the Navy had not incorp. a mgmt. approach to guide & assess implementation of FRP, This report examines the extent to which the Navy has: made progress in implementing a sound mgmt. approach for FRP; & evaluated the long-term risks & tradeoffs of FRP-related changes.

Optimal Scheduling and Operating Target (OPTAR) Cost Model for Aircraft Carriers in the Fleet Response Plan

Optimal Scheduling and Operating Target (OPTAR) Cost Model for Aircraft Carriers in the Fleet Response Plan
Author:
Publisher:
Total Pages: 73
Release: 2008
Genre:
ISBN:

Download Optimal Scheduling and Operating Target (OPTAR) Cost Model for Aircraft Carriers in the Fleet Response Plan Book in PDF, Epub and Kindle

The Fleet Response Plan was developed to provide persistent readiness of the carrier fleet to respond to a variety of situations. This capability is developed through the Fleet Readiness Training Plan (FRTP) where the Navy's carriers are scheduled in staggered 32-month cycles consisting of four phases of progressive readiness levels. Required operating target funds, or OPTAR, are budgeted to each carrier by Commander Naval Air Forces to achieve and maintain that readiness. Future OPTAR budgets, however, will be constrained by a 20-percent reduction in fiscal years 2009 through 2013. To compensate, funding priority is given to carriers in higher readiness phases at the expense of carriers conducting baseline training and maintenance, adversely impacting the fleet s ability to exercise the Fleet's Response Plan as originally intended. This thesis optimizes scheduling synchronously across all carriers to meet established FRTP readiness goals. Then, using a cost model based on recent historical spending and employment data, this thesis generates an estimate of required funding to operate all carriers. Ultimately, this thesis provides a link between operational requirements and OPTAR budget requirements.

Assessment of Surface Ship Maintenance Requirements

Assessment of Surface Ship Maintenance Requirements
Author: Robert Button
Publisher: Rand Corporation
Total Pages: 0
Release: 2015
Genre: Warships
ISBN:

Download Assessment of Surface Ship Maintenance Requirements Book in PDF, Epub and Kindle

The Department of Defense is likely to face years of declining resources as the U.S. government grapples with fiscal challenges. These challenges affect every account, including those associated with surface ship maintenance and operations. At the same time, there has been widespread concern that surface ship materiel readiness is declining due to a high pace of operations and a sense that there have been many instances of deferred maintenance. The need to balance fiscal reality and a continued need for ready ships is likely to be an ongoing challenge. At the request of the Assessment Division of the Office of the Chief of Naval Operations, this report: (1) determines the impact on long-term fleet readiness, Operational Availability (Ao), and Expected Service Life (ESL) caused by near-term reductions in Operations and Maintenance (O&M) accounts; (2) recommends potential strategies to minimize negative impacts to Ao and ESL and maintain the largest, most capable fleet possible; (3) develops a maintenance requirement concept, per ship class, that supports ESL, but allows for some risk within the maintenance strategy; and (4) defines the risks to Ao and ESL resulting from the new requirement. The methodology could be applicable to multiple ship classes.

Impacts of the Fleet Response Plan on Surface Combatant Maintenance

Impacts of the Fleet Response Plan on Surface Combatant Maintenance
Author:
Publisher:
Total Pages: 0
Release: 2006
Genre:
ISBN:

Download Impacts of the Fleet Response Plan on Surface Combatant Maintenance Book in PDF, Epub and Kindle

Until recently, the Navy's ship readiness objectives and maintenance needs for surface combatants were met through a two-year cycle. Ships were deployed in forward-presence roles for six months and spent the next 18 month primarily in maintenance and training. A ship would then be ready for another deployment. This approach satisfied the many personnel, presence, maintenance, and mission requirements of the Cold War era; however, new global threats have recently challenged these traditional methods of operation.

Changing Aircraft Carrier Procurement Schedules

Changing Aircraft Carrier Procurement Schedules
Author: John F. Schank
Publisher: RAND Corporation
Total Pages: 0
Release: 2011-03-04
Genre: Technology & Engineering
ISBN: 9780833051455

Download Changing Aircraft Carrier Procurement Schedules Book in PDF, Epub and Kindle

The Secretary of Defense plans to shift Navy aircraft carrier acquisition to every five years. This shift should have little impact on force structure and the industrial base in the next decade. After that, the force structure shrinks, as does the chance of meeting goals for the number of deployed aircraft carriers. The plan could have a larger effect on any later desire to increase the number of aircraft carriers in the fleet.