Woodbridge Research Facility Remedial Investigation/Feasibility Study; Focused Feasibility Study for Operable Unit One

Woodbridge Research Facility Remedial Investigation/Feasibility Study; Focused Feasibility Study for Operable Unit One
Author:
Publisher:
Total Pages: 0
Release: 1997
Genre:
ISBN:

Download Woodbridge Research Facility Remedial Investigation/Feasibility Study; Focused Feasibility Study for Operable Unit One Book in PDF, Epub and Kindle

Operable Unit One (OUl) at the Woodbridge Research Facility (WRF) has been defined as the area encompassing AREEs 1 through 6B (former dumps) and AREE 7 (former Pistol Range). A Focused Feasibility Study, has been conducted to identify and screen remedial alternatives for OUl, to address, contaminated groundwater, surface soil, subsurface soil, and sediment detected at AREEs associated with OU1. This report summarizes the history, current conditions, and environmental data. Human health and ecological risk assessments are presented. General response actions, technology types, and process options appropriate for the remediation of contaminated media are identified. Process options are screened and assembled into five alternatives. Each alternative is evaluated in detail using the nine criteria identified in the NCP (40 CFR 300.430(e)). The report concludes with a comparison, of the remedial options under consideration.

Woodbridge Research Facility Remedial Investigation/Feasibility Study; Focused Feasibility Study for Operable Unit Three

Woodbridge Research Facility Remedial Investigation/Feasibility Study; Focused Feasibility Study for Operable Unit Three
Author:
Publisher:
Total Pages: 0
Release: 1997
Genre:
ISBN:

Download Woodbridge Research Facility Remedial Investigation/Feasibility Study; Focused Feasibility Study for Operable Unit Three Book in PDF, Epub and Kindle

Operable Unit 3 (OU3) at the Woodbridge Research Facility (WRF) has been defined as the Main Ditch (AREE 22) and the area between the northern boundary of the Main Compound and the Main Ditch (portions of AREEs 11 and 17). This report summarizes the site history, current conditions, and environmental data associated with OU3. Human Health and Ecological Risk assessments are presented. General response actions, technology types, and process options appropriate for the remediation of sediment are identified as well as proposed elements for the implementation of institutional controls for the OU. Process options are screened and assembled into six alternatives. Each alternative is evaluated in detail using the nine criteria identified in the NCP (40 CFR 300.430(e)). The report concludes with a comparison of the remedial options under consideration.