Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site at Mexican Hat, Utah

Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site at Mexican Hat, Utah
Author:
Publisher:
Total Pages: 189
Release: 1988
Genre:
ISBN:

Download Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site at Mexican Hat, Utah Book in PDF, Epub and Kindle

This document provides Appendix E of the Remedial Action Plan (RAP) presented in 1988 for the stabilization of the inactive uranium mill tailings at the Mexican Hat, Utah site. The RAP was developed to serve a two- fold purpose. It presents the activities proposed by the Department of Energy (DOE) to accomplish long-term stabilization and control of the residual radioactive materials (RRM) from Monument Valley, Arizona, and Mexican Hat, Utah, at the Mexican Hat disposal site. It also serves to document the concurrence of both the Navajo Nation and the Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by the DOE and the Navajo Nation and concurrence by the NRC, becomes Appendix B of the Cooperative Agreement. The RAP has been structured to provide a comprehensive understanding of the remedial action proposed for the Monument Valley and Mexican Hat sites. It includes specific design and construction requirements for the remedial action.

Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site at Mexican Hat, Utah

Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site at Mexican Hat, Utah
Author:
Publisher:
Total Pages: 137
Release: 1988
Genre:
ISBN:

Download Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site at Mexican Hat, Utah Book in PDF, Epub and Kindle

This Remedial Action Plan (RAP) has been developed to serve a two- fold purpose. It presents the activities proposed by the Department of Energy (DOE) to accomplish long-term stabilization and control of the residual radioactive materials (RRM) from Monument Valley Arizona, and Mexican Hat, Utah, at the Mexican Hat disposal site. It also serves to document the concurrence of both the Navajo Nation and the Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by DOE and the Navajo Nation and concurrence by the NRC, becomes Appendix B of the Cooperative Agreement. This document has been structured to provide a comprehensive understanding of the remedial action proposed for the Monument Valley and Mexican Hat sites. It includes specific design and construction requirements for the remedial action. Pertinent information and data are included with reference given to the supporting documents. Appendices A, B, and C are provided as part of this document. Appendix A presents regulatory compliance issues, Appendix B provides details of the engineering design, and Appendix C presents the radiological support plan.

Modification to the Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site at Mexican Hat, Utah

Modification to the Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site at Mexican Hat, Utah
Author:
Publisher:
Total Pages: 249
Release: 1989
Genre:
ISBN:

Download Modification to the Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site at Mexican Hat, Utah Book in PDF, Epub and Kindle

This document provides the modifications to the 1988 Remedial Action Plan (RAP) of the contaminated materials at the Monument Valley, Arizona, and Mexican Hat, Utah. The text detailing the modifications and attachments 1 through 6 are provided with this document. The RAP was developed to serve a two-fold purpose. It presents the activities proposed by the Department of Energy (DOE) to accomplish long-term stabilization and control of the residual radioactive materials (RRM) from Monument Valley, Arizona, and Mexican Hat, Utah, at the Mexican Hat disposal site. It also serves to document the concurrence of both the Navajo Nation and the Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by DOE and the Navajo Nation and concurrence by the NRC, becomes Appendix B of the Cooperative Agreement. This document has been structured to provide a comprehensive understanding of the remedial action proposed for the Monument Valley and Mexican Hat sites. It includes specific design and construction requirements for the remedial action. Pertinent information and data are included with reference given to the supporting documents.

UMTRA

UMTRA
Author:
Publisher:
Total Pages: 36
Release: 1987
Genre: Radioactive substances
ISBN:

Download UMTRA Book in PDF, Epub and Kindle

Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site at Mexican Hat, Utah

Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site at Mexican Hat, Utah
Author:
Publisher:
Total Pages: 266
Release: 1988
Genre:
ISBN:

Download Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site at Mexican Hat, Utah Book in PDF, Epub and Kindle

This appendix is an assessment of the present conditions of the inactive uranium mill site near Mexican Hat, Utah. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan. Plan is to characterize the conditions at the mill and tailings site so that the Remedial Action Contractor may complete final designs of the remedial action.

Remedial Action Plan and Final Design for Stabilization of the Inactive Uranium Mill Tailings at Green River, Utah. Volume 1, Text, Appendices A, B, and C

Remedial Action Plan and Final Design for Stabilization of the Inactive Uranium Mill Tailings at Green River, Utah. Volume 1, Text, Appendices A, B, and C
Author:
Publisher:
Total Pages:
Release: 1991
Genre:
ISBN:

Download Remedial Action Plan and Final Design for Stabilization of the Inactive Uranium Mill Tailings at Green River, Utah. Volume 1, Text, Appendices A, B, and C Book in PDF, Epub and Kindle

This Remedial Action Plan (RAP) has been developed to serve a threefold purpose. It presents the series of activities that are proposed by the US Department of Energy (DOE) to accomplish long-term stabilization and control of radioactive materials at the inactive uranium processing site located near Green River, Utah. It provides a characterization of the present conditions of the site. It also serves to document the concurrence of the state of Utah and the US Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by the DOE and the state of Utah, and concurrence by the NRC, becomes Appendix 8 of the Cooperative Agreement.