Navy Force Structure and Shipbuilding Plans

Navy Force Structure and Shipbuilding Plans
Author: Ronald O'Rourke
Publisher: DIANE Publishing
Total Pages: 43
Release: 2010-03
Genre: Technology & Engineering
ISBN: 1437919596

Download Navy Force Structure and Shipbuilding Plans Book in PDF, Epub and Kindle

Discusses the U.S. Navy¿s proposed FY 2010 budget requests funding for eight new Navy ships. This total includes two relatively expensive, high-capability combatant ships (a Virginia-class attack submarine and a DDG-51 class Aegis destroyer) and six relatively inexpensive ships (three Littoral Combat Ships [LCSs], two TAKE-1 auxiliary dry cargo ships, and one Joint High Speed Vessel [JHSV]). Concerns about the Navy¿s prospective ability to afford its long-range shipbuilding plan, combined with year-to-year changes in Navy shipbuilding plans and significant cost growth and other problems in building certain new Navy ships, have led to concerns about the status of Navy shipbuilding and the potential future size and capabilities of the fleet. Illus.

Navy Force Structure and Shipbuilding Plans

Navy Force Structure and Shipbuilding Plans
Author: Ronald O'Rourke
Publisher:
Total Pages: 0
Release: 2008
Genre: Cruisers (Warships)
ISBN:

Download Navy Force Structure and Shipbuilding Plans Book in PDF, Epub and Kindle

In February 2008, as part of its proposed FY2009 budget, the Navy submitted to Congress the FY2009 version of its annual 30-year shipbuilding plan. The 30-year plan is intended to support the Navy's goal of achieving and maintaining a 313-ship fleet. The Navy first presented the 313-ship plan to Congress in February 2006. The increase in the Navy's estimated cost for implementing the plan is so large that the Navy no longer appears to have a clearly identifiable, announced strategy for generating the funds needed to implement the 30-year plan, at least not without significantly reducing funding for other Navy programs or increasing the Navy's programmed budget in coming years by billions of dollars per year. Concerns about the Navy's prospective ability to afford the 30-year shipbuilding plan, combined with year-to-year changes in Navy shipbuilding plans and significant cost growth and other problems in building certain new Navy ships, have led to strong concerns among some Members about the status of Navy shipbuilding and the potential future size and capabilities of the fleet. As a consequence of these strong concerns, some Members in hearings this year on the Navy's proposed FY2009 budget have strongly criticized aspects of the Navy's shipbuilding plan and indicated that they are considering making changes to the plan. Some Members in the House, for example, have indicated that they are considering the option of not procuring a third DDG-1000 class destroyer in FY2009, as the Navy has requested, and using the funding programmed for that ship to instead procure other kinds of ships for the Navy. This report will be updated as events warrant.

Crs Report for Congress

Crs Report for Congress
Author: Congressional Research Service: The Libr
Publisher: BiblioGov
Total Pages: 44
Release: 2013-11
Genre:
ISBN: 9781293253663

Download Crs Report for Congress Book in PDF, Epub and Kindle

Navy and Department of Defense (DOD) officials reportedly are considering reducing at least some parts of Navy force structure from current levels. In addition, the Navy reportedly submitted to the Office of the Secretary of Defense a draft FY2006-FY2011 budget plan that would delay or reduce a number of planned Navy shipbuilding programs. These developments have caused concern among Members of Congress and others about potential DOD plans for the Navy and the effect these plans might have on the shipbuilding industrial base. The current absence of an officially approved, consensus plan for the size and structure of the Navy may make it difficult, if not impossible, for Congress to conduct effective oversight by reconciling desired Navy capabilities with planned Navy force structure, and planned Navy force structure with supporting Navy programs and budgets. It may also cause business-planning uncertainty for industry. Statements from Navy officials suggest that the next Navy force structure plan may call for a fleet of roughly 250 to 330 ships. Historical figures for the total number of ships in the Navy are not necessarily a reliable yardstick for assessing the adequacy of today's Navy or a future planned Navy that includes a certain number of ...

Navy Force Structure and Shipbuilding Plans

Navy Force Structure and Shipbuilding Plans
Author: Ronald O'Rourke
Publisher:
Total Pages: 59
Release: 2005
Genre: Sea-power
ISBN:

Download Navy Force Structure and Shipbuilding Plans Book in PDF, Epub and Kindle

The Navy in February 2006 proposed to maintain in coming years a fleet of 313 ships, including, among other things, 11 aircraft carriers, 48 attack submarines (SSNs), 88 cruisers and destroyers, 55 Littoral Combat Ships (LCSs), 31 amphibious ships, and a Maritime Prepositioning Force (Future), or MPF(F), squadron with 12 new-construction amphibious and sealift-type ships. The Navy says that for its shipbuilding plans to be affordable and executable, the Navy needs to control certain non-shipbuilding expenditures and build ships within estimated costs. The Navy's shipbuilding plans raise potential issues regarding the shipbuilding industrial base, particularly in the areas of the submarine design and engineering base, and the surface combatant construction base.

Potential Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

Potential Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress
Author:
Publisher:
Total Pages: 63
Release: 2005
Genre:
ISBN:

Download Potential Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress Book in PDF, Epub and Kindle

In February 2005, the Navy testified that the Navy in future years may require a total of 260 to 325 ships, or possibly 243 to 302 ships, depending on how much the Navy uses new technologies and a new ship crewing and deployment method called Sea Swap. In March 2005, the Navy provided a report to Congress showing the notional compositions of 260- and 325-ship fleets in FY2035. Navy ambiguity regarding required numbers of ships, together with proposed reductions and delays in Navy ship-procurement programs in the FY2006-FY2011 Future Years Defense Plan (FYDP), have caused concern among Members of Congress and others about future Navy capabilities and the shipbuilding industrial base. Ambiguity regarding required numbers of Navy ships may cause businessplanning uncertainty for companies that own shipyards, and may make it difficult, if not impossible, for Congress to conduct effective oversight of the Navy budget and ship-procurement programs. Historical figures for the total number of ships in the Navy are not necessarily a reliable yardstick for assessing the adequacy of today's Navy or a future planned Navy that includes a certain number of ships. Similarly, trends over time in the total number of ships in the Navy are not necessarily a reliable indicator of the direction of change over time in the fleet s ability to perform its stated missions.

Navy Force Structure and Shipbuilding Plans

Navy Force Structure and Shipbuilding Plans
Author: Congressional Service
Publisher: Createspace Independent Publishing Platform
Total Pages: 134
Release: 2017-12
Genre:
ISBN: 9781981318940

Download Navy Force Structure and Shipbuilding Plans Book in PDF, Epub and Kindle

The current and planned size and composition of the Navy, the rate of Navy ship procurement, and the prospective affordability of the Navy's shipbuilding plans have been oversight matters for the congressional defense committees for many years. The Navy's proposed FY2018 budget, as amended on May 24, 2017, requests the procurement of nine new ships, including one Gerald R. Ford (CVN-78) class aircraft carrier, two Virginia-class attack submarines, two DDG-51 class destroyers, two Littoral Combat Ships (LCSs), one TAO-205 class oiler, and one towing, salvage, and rescue ship. On December 15, 2016, the Navy released a new force-structure goal that calls for achieving and maintaining a fleet of 355 ships of certain types and numbers. Key points about this new 355-ship force-level goal include the following: The 355-ship force-level goal is the result of a Force Structure Assessment (FSA) conducted by the Navy in 2016. The Navy conducts an FSA every few years, as circumstances require, to determine its force-structure goal. The new 355-ship force-level goal replaces a 308-ship force-level goal that the Navy released in March 2015. The actual size of the Navy in recent years has generally been between 270 and 290 ships. The figure of 355 ships appears close to an objective of building toward a fleet of 350 ships that was announced by the Trump campaign organization during the 2016 presidential election campaign. The 355-ship goal, however, reflects the national security strategy and national military strategy that were in place in 2016 (i.e., the Obama Administration's national security strategy and national military strategy), while the Trump campaign organization's 350-ship goal appears to have a different origin. Compared to the previous 308-ship force-level goal, the new 355-ship force-level goal includes 47 additional ships, or about 15% more ships. More than 47 ships, however, would need to be added to the Navy's 30-year shipbuilding plan to achieve and maintain the Navy's 355-ship fleet, unless the Navy extends the service lives of existing ships beyond currently planned figures and/or reactivates recently retired ships: CRS estimates that 57 to 67 ships would need to be added to the Navy's FY2017 30-year (FY2017-FY2046) shipbuilding plan to achieve the Navy's 355-ship fleet and maintain it through the end of the 30-year period (i.e., through FY2046).

Crs Report for Congress

Crs Report for Congress
Author: Congressional Research Service: The Libr
Publisher: BiblioGov
Total Pages: 50
Release: 2013-11
Genre:
ISBN: 9781294250869

Download Crs Report for Congress Book in PDF, Epub and Kindle

The planned size of the Navy, the rate of Navy ship procurement, and the prospective affordability of the Navy's shipbuilding plans have been matters of concern for the congressional defense committees for the past several years. The Navy in February 2006 presented to Congress a goal of achieving and maintaining a fleet of 313 ships, consisting of certain types and quantities of ships. Since then, the Navy has changed its desired quantities for some of those ship types, and the Navy's goals now add up to a desired fleet of 320 or 321 ships. The Navy's proposed FY2012 budget requests funding for the procurement of 10 new battle force ships (i.e., ships that count against the 320-321 ship goal). The 10 ships include two Virginia-class attack submarines, one DDG-51 class Aegis destroyer, four Littoral Combat Ships (LCSs), one LPD-17 class amphibious ship, one Mobile Landing Platform (MLP) ship (i.e., a maritime prepositioning ship), and one Joint High Speed Vessel (JHSV). The Navy's five-year (FY2012-FY2016) shipbuilding plan, submitted to Congress in conjunction with the Navy's proposed FY2012 budget, includes a total of 55 new battle force ships, or an average of 11 per year. Of the 55 ships in the plan, ...

Navy Force Structure and Shipbuilding Plans

Navy Force Structure and Shipbuilding Plans
Author: Congressional Research Congressional Research Service
Publisher: CreateSpace
Total Pages: 70
Release: 2014-12-22
Genre:
ISBN: 9781505903805

Download Navy Force Structure and Shipbuilding Plans Book in PDF, Epub and Kindle

The Navy's proposed FY2015 budget requests funding for the procurement of seven new battle force ships (i.e., ships that count against the Navy's goal for achieving and maintaining a fleet of 306 ships). The seven ships include two Virginia-class attack submarines, two DDG-51 class Aegis destroyers, and three Littoral Combat Ships (LCSs). The Navy's proposed FY2015-FY2019 five-year shipbuilding plan includes a total of 44 ships, compared to a total of 41 ships in the FY2014-FY2018 five-year shipbuilding plan. The planned size of the Navy, the rate of Navy ship procurement, and the prospective affordability of the Navy's shipbuilding plans have been matters of concern for the congressional defense committees for the past several years. The Navy's FY2015 30-year (FY2015-FY2044) shipbuilding plan, like many previous Navy 30-year shipbuilding plans, does not include enough ships to fully support all elements of the Navy's 306-ship goal over the entire 30-year period. In particular, the Navy projects that the fleet would experience a shortfall in amphibious ships from FY2015 through FY2017, a shortfall in small surface combatants from FY2015 through FY2027, and a shortfall in attack submarines from FY2025 through FY2034. The Navy delivered its narrative report on the FY2015 30-year shipbuilding plan to CRS on July 3, 2014. The Navy estimates in the report that the plan would cost an average of about $16.7 billion per year in constant FY2014 dollars to implement, including an average of about $15.7 billion per year during the first 10 years of the plan, an average of about $19.7 billion per year during the middle 10 years of the plan, and an average of about $14.6 billion per year during the final 10 years of the plan. A December 2014 Congressional Budget Office (CBO) report on the Navy's FY2015 30-year shipbuilding plan estimates that the plan will require about 13% more funding to implement than the Navy estimates, including about 6% more than the Navy estimates during the first 10 years of the plan, about 14% more than the Navy estimates during the middle 10 years of the plan, and about 20% more than the Navy estimates during the final 10 years of the plan. Over the years, CBO's estimates of the cost to implement the Navy's 30-year shipbuilding plan have generally been higher than the Navy's estimates. Some of the difference between CBO's estimates and the Navy's estimates, particularly in the latter years of the plan, is due to a difference between CBO and the Navy in how to treat inflation in Navy shipbuilding. The program that contributes the most to the difference between the CBO and Navy estimates of the cost of the 30-year plan is a future destroyer that appears in the latter years of the 30-year plan.

Navy Force Structure and Shipbuilding Plans

Navy Force Structure and Shipbuilding Plans
Author: O'Rourke
Publisher: CreateSpace
Total Pages: 60
Release: 2015-01-03
Genre: Political Science
ISBN: 9781505432046

Download Navy Force Structure and Shipbuilding Plans Book in PDF, Epub and Kindle

This report provides background information and presents potential issues for Congress concerning the Navy's ship force-structure goals and shipbuilding plans. The planned size of the Navy, the rate of Navy ship procurement, and the prospective affordability of the Navy's shipbuilding plans have been matters of concern for the congressional defense committees for the past several years. Decisions that Congress makes on Navy shipbuilding programs can substantially affect Navy capabilities and funding requirements, and the U.S. shipbuilding industrial base.