Phase 2 Remedial Investigation Report Army Materials Technology Laboratory Task Order 1 Remedial Investigation/Feasibility Study

Phase 2 Remedial Investigation Report Army Materials Technology Laboratory Task Order 1 Remedial Investigation/Feasibility Study
Author:
Publisher:
Total Pages: 280
Release: 1994
Genre:
ISBN:

Download Phase 2 Remedial Investigation Report Army Materials Technology Laboratory Task Order 1 Remedial Investigation/Feasibility Study Book in PDF, Epub and Kindle

Phase 2 of a remedial investigation (RI) has been conducted at the U.S. Army Materials Technology Laboratory (MTL) in Watertown, Massachusetts. The U.S. Army Environmental Center, New England Division, contracted with Roy F. Weston, Inc. (WESTON) under the Base Closure Program Contract Number DAA15-9O-D-0009, Task Order 1, to complete, among other tasks, the Phase 2 RI at MTL. After the Phase 1 RI was initiated, MTL was recommended for closure by the Defense Secretary's Commission on Base Realignment and Closures. The original objectives of the Phase 1 RI did not include assessing concerns associated with future unlimited use of the site by the public after the closure of MTL. To do so, sampling in buildings, as well as more extensive environmental sampling and risk assessment, was required. This additional information was collected during the Phase 2 RI to properly evaluate potential remedial measures that would allow subsequent land use consistent with assigned reuse.

Remedial Investigation Addendum Report Data Item A009. Volume 2: Appendices A-G.

Remedial Investigation Addendum Report Data Item A009. Volume 2: Appendices A-G.
Author:
Publisher:
Total Pages: 210
Release: 1993
Genre:
ISBN:

Download Remedial Investigation Addendum Report Data Item A009. Volume 2: Appendices A-G. Book in PDF, Epub and Kindle

The U.S. Army Environmental Center (USAEC) directed ABB Environmental Services, Inc. (ABB-ES), under Contract No. DAAA15-91-D-0008, to collect environmental samples at Fort Devens, Massachusetts to fill data gaps identified during initiation of the Feasibility Study (FS) for Group 1A sites. The Group 1A sites include the Shepley's Hill Landfill and Cold Spring Brook Landfill at Fort Devens. This Remedial Investigation (RI) Addendum report summarizes the supplemental field investigations, presents the data obtained, and updates the baseline risk assessment prepared for the RI report. Field investigation programs were conducted between September 1992 and July 1993 and included collecting and analyzing of sediment core samples from Plow Shop and Cold Spring Brook ponds, collecting and analyzing fish tissue samples from these two ponds, and conducting a macroinvertebrate study of the two ponds. In addition, several new monitoring wells were installed and groundwater samples were collected for analysis from 27 monitoring wells at Shepley's Hill Landfill and from 10 monitoring wells at Cold Spring Brook Landfill. Soil, sediment, and groundwater samples were also collected from several other areas, including Nonacoicus Brook Wetland and Grove Pond adjacent to Shepley's Hill Landfill, and the Magazine Area adjacent to Cold Spring Brook Landfill.

Feasibility Study (FS) and Remedial Investigation/Site Inspection (RI/SI), Addendum for Fort George G. Meade, Maryland. Revision 2

Feasibility Study (FS) and Remedial Investigation/Site Inspection (RI/SI), Addendum for Fort George G. Meade, Maryland. Revision 2
Author:
Publisher:
Total Pages: 189
Release: 1993
Genre:
ISBN:

Download Feasibility Study (FS) and Remedial Investigation/Site Inspection (RI/SI), Addendum for Fort George G. Meade, Maryland. Revision 2 Book in PDF, Epub and Kindle

This Quality Control Plan has been prepared to address the Feasibility Study (FS) and Remedial Investigation/Site Inspection (RI/SI) Addendum activities and a Change Order to Delivery Order No. 0009 dated July 15, 1993, at the Fort George G. Meade (FGGM). It has been prepared for the U.S. Army Environmental Center (USAEC), formerly the U.S. Army Toxic and Hazardous Materials Agency (USATHAMA), to fulfill the requirement of deliverable ELIN A004 under Task Order 0009 of TEPS contract DAAA15-9l-D-00l6. It has been developed in accordance with the USATHAMA Quality Assurance Program, USATHAMA Geotechnical Requirements, and Guidance for Conducting Remedial Investigations and Feasibility Studies Under CERCLA.

Remedial Investigation Addendum Report Data Item A009. Volume 1: Report Test

Remedial Investigation Addendum Report Data Item A009. Volume 1: Report Test
Author:
Publisher:
Total Pages: 534
Release: 1993
Genre:
ISBN:

Download Remedial Investigation Addendum Report Data Item A009. Volume 1: Report Test Book in PDF, Epub and Kindle

The U.S. Army Environmental Center (USAEC) directed ABB Environmental Services, Inc. (ABB-ES), under Contract No. DAAA15-91-D-0008, to collect environmental samples at Fort Devens, Massachusetts to fill data gaps identified during initiation of the Feasibility Study (FS) for Group 1A sites. The Group 1A sites include the Shepley's Hill Landfill and Cold Spring Brook Landfill at Fort Devens. This Remedial Investigation (RI) Addendum report summarizes the supplemental field investigations, presents the data obtained, and updates the baseline risk assessment prepared for the RI report. Field investigation programs were conducted between September 1992 and July 1993 and included collecting and analyzing of sediment core samples from Plow Shop and Cold Spring Brook ponds, collecting and analyzing fish tissue samples from these two ponds, and conducting a macroinvertebrate study of the two ponds. In addition, several new monitoring wells were installed and groundwater samples were collected for analysis from 27 monitoring wells at Shepley's Hill Landfill and from 10 monitoring wells at Cold Spring Brook Landfill. Soil, sediment, and groundwater samples were also collected from several other areas, including Nonacoicus Brook Wetland and Grove Pond adjacent to Shepley's Hill Landfill, and the Magazine Area adjacent to Cold Spring Brook Landfill.