In February 2001, Washington Winds Inc. (the project developer) submitted a proposal to Bonneville Power Administration (BPA) for a site north of the cities of Sunnyside and Prosser in Washington where wind power facilities could be developed. After considering preliminary information, BPA decided to examine the proposed project and consider purchasing and transmitting power from the project. The project developer also submitted Conditional use Permit (CUP) applications to Benton and Yakima Counties. Benton County, serving as the lead agency for the State Environmental Policy Act (SEPA), issued a Determination of Significance on June 11, 2001. The action proposed by BPA is to: (1) execute a 20-year power purchase agreement with the project developer for up to 50 average megawatts (aMW) (up to about 200 megawatts [MW]) of electrical energy from the proposed Maiden Wind Farm; and (2) execute construction and generation interconnection agreements with the project developer to integrate the power generated by the proposed Maiden Wind Farm into BPA's transmission system. The need for the proposed action arises primarily from BPA's statutory obligations and planning directives. BPA will consider the information in this Environmental Impact Statement (EIS), public comments, and other factors when deciding whether to purchase power from the proposed wind project and transmit it over BPA transmission lines. Benton and Yakima County Planning Departments will consider information in this EIS when deciding whether to grant a CUP and allow the proposed project to be developed.

Maiden Wind Farm

Maiden Wind Farm
Author: United States. Bonneville Power Administration
Publisher:
Total Pages: 28
Release: 2002
Genre: Wind power
ISBN:

Download Maiden Wind Farm Book in PDF, Epub and Kindle

Maiden Wind Farm, Final NEPA/SEPA Environmental Impact Statement

Maiden Wind Farm, Final NEPA/SEPA Environmental Impact Statement
Author:
Publisher:
Total Pages: 5
Release: 2003
Genre:
ISBN:

Download Maiden Wind Farm, Final NEPA/SEPA Environmental Impact Statement Book in PDF, Epub and Kindle

BPA's proposed action is the execution of power purchase and construction and generation interconnection agreements to acquire and transmit up to 50 aMW (up to about 200 MW) of output from the proposed Maiden Wind Farm, which would be developed to generate up to 494 MW. Benton and Yakima Counties' proposed action is to grant Conditional Use Permits (CUPs) and other required permits for full build-out of the project, which would require construction of up to 549 wind turbines for a 494-MW project. The EIS evaluates two alternatives--the Proposed Action (which means that part or all of the proposed project would be built) and No Action. BPA would not purchase or transmit power from the project under the No Action Alternative and it is therefore likely that the project would not be constructed. Washington Winds Inc. proposes to construct and operate up to 494 megawatts (MW) of wind generation on privately- and publicly-owned property in Benton and Yakima Counties, Washington. This EIS evaluates the environmental effects of BPA's Proposed Action to execute power purchase and interconnection agreements for the purpose of acquiring up to 50 average megawatts (aMW) (up to about 200 MW) of the project developer's proposed Maiden Wind Farm. The project developer has requested a CUP for up to 494 MW. Although the full 494 MW of power may or may not be constructed, this EIS evaluates impacts from full buildout of the project. The project would be located about 10 miles northeast of Sunnyside in the Rattlesnake Hills and would occupy approximately 251 acres of land. Approximately 1,063 acres would be temporarily occupied during construction by facilities such as staging areas, equipment laydown areas, and rock quarries. Except for portions of two sections of land owned by the Washington Department of Natural Resources (DNR), the project would be constructed on privately-owned farm and ranch land in Benton and Yakima Counties. The major facilities of the project include up to 549 wind turbines with small transformers at the base of each turbine tower, underground and overhead collector cables, access roads, up to two substations, up to three operation and maintenance buildings, a potential 4-mile 230-kilovolt (kV) transmission line, and up to four meteorological towers (see Figure 2.1-2 in the Draft EIS). Construction of the project could begin in early 2003, with at least partial power generation expected as early as December 2003. Construction of the full project would take about nine months.

Maiden Wind Farm, Benton County, Washington

Maiden Wind Farm, Benton County, Washington
Author: United States. Bonneville Power Administration
Publisher:
Total Pages: 95
Release: 2002
Genre: Environmental impact analysis
ISBN:

Download Maiden Wind Farm, Benton County, Washington Book in PDF, Epub and Kindle