Interim Remedial Measures Final Engineering Report for Activities at Ithaca First Street Former MGP Site, City of Ithaca, Tompkins County, New York

Interim Remedial Measures Final Engineering Report for Activities at Ithaca First Street Former MGP Site, City of Ithaca, Tompkins County, New York
Author: New York State Electric and Gas Corporation
Publisher:
Total Pages:
Release: 1999
Genre: Coal-tar
ISBN:

Download Interim Remedial Measures Final Engineering Report for Activities at Ithaca First Street Former MGP Site, City of Ithaca, Tompkins County, New York Book in PDF, Epub and Kindle

This report summarizes the implementation of the approved work plan which was implemented from August 3, 1998 through October 27, 1998 at the Ithaca First Street Former MGP Site, presently the Ithaca Municipal Waste Water Treatment Facility, located on Third Street in the City of Ithaca. The work plan was undertaken by NYSEG and consisted of the removal and disposal of 12,610 tons of stockpiled coal tar soil and debris. This material was generated in 1986 during a phase of construction for the Waste Water Treatment Facility, and the contaminated soil was stockpiled on the northern portion of the Facility. This work plan was reviewed and approved on July 31, 1998 by the New York State Department of Environmental Conservation.

Interim Remedial Measures Final Engineering Report for Activities at Ithaca Court Street Former Manufactured Gas Plant Site, City of Ithaca, Tompkins County, New York

Interim Remedial Measures Final Engineering Report for Activities at Ithaca Court Street Former Manufactured Gas Plant Site, City of Ithaca, Tompkins County, New York
Author: New York State Electric and Gas Corporation
Publisher:
Total Pages:
Release: 2001
Genre: Coal-tar
ISBN:

Download Interim Remedial Measures Final Engineering Report for Activities at Ithaca Court Street Former Manufactured Gas Plant Site, City of Ithaca, Tompkins County, New York Book in PDF, Epub and Kindle

This report documents the implementation of the approved remedial measures at the Ithaca Court Street Former MGP Site, City of Ithaca, Tompkins County, New York. The remedial work can be characterized as controlled removal and disposal of contaminated water, soil and coal tar associated with two underground former tar storage vessels. This work was proposed in a document titled Interim Remedial Measures Work Plan, which was reviewed and approved by the New York State Dept. of Environmental Conservation.

Interim Remedial Measures Final Engineering Report for Activities at Ithaca Court Street Former Manufactured Gas Plant Site Subsurface Wooden Duct Extension, City of Ithaca, Tompkins County, New York

Interim Remedial Measures Final Engineering Report for Activities at Ithaca Court Street Former Manufactured Gas Plant Site Subsurface Wooden Duct Extension, City of Ithaca, Tompkins County, New York
Author: New York State Electric and Gas Corporation
Publisher:
Total Pages:
Release: 2001
Genre: Coal-tar
ISBN:

Download Interim Remedial Measures Final Engineering Report for Activities at Ithaca Court Street Former Manufactured Gas Plant Site Subsurface Wooden Duct Extension, City of Ithaca, Tompkins County, New York Book in PDF, Epub and Kindle

This report summarizes the implementation of the approved Interim Remedial Measures Work Plan for Activities at Ithaca Court street Former Manufactured Gas Plant Site, Subsurface Wooden Duct Extension, City of Ithaca, Tompkins County, New York which was accomplished from March 13, 2000 through March 24, 2000. This work consisted of removal and disposal of free phase tar contained in the subsurface wooden duct and any coal tar contaminated soil surrounding the duct that exists under the properties of the Old Port Harbor Restaurant and Watts Distributing Compnay. The wooden duct was part of the plant operation that connected the Ithaca Court Street Former Manufactured Gas Plant (MGP) Site and the Ithaca Cayuga Inlet Coal Tar Site.

Interim Remedial Measures Final Engineering Report for Activities at Ithaca Cayuga Inlet Coal Tar Site, City of Ithaca, Tompkins County, New York

Interim Remedial Measures Final Engineering Report for Activities at Ithaca Cayuga Inlet Coal Tar Site, City of Ithaca, Tompkins County, New York
Author: New York State Electric and Gas Corporation
Publisher:
Total Pages:
Release: 1999
Genre: Cayuga Inlet MGP Site (Ithaca, N.Y.)
ISBN:

Download Interim Remedial Measures Final Engineering Report for Activities at Ithaca Cayuga Inlet Coal Tar Site, City of Ithaca, Tompkins County, New York Book in PDF, Epub and Kindle

This report summarizes the implementation of the Interim Remedial Measures (IRM) Work Plan which was accomplished from February 8, 1999 through April 16,1999 at the Ithaca Cayuga Inlet Coal Tar Site located in the City of Ithaca. The Work Plan was a plan for clean up of coal tar, coal tar soils and coal tar contaminated water.

Interim Remedial Measures Citizen Participation Plan for Activities at Ithaca Court Street Former Manufactured Gas Plant (MGP) Site, City of Ithaca, Tompkins County, New York

Interim Remedial Measures Citizen Participation Plan for Activities at Ithaca Court Street Former Manufactured Gas Plant (MGP) Site, City of Ithaca, Tompkins County, New York
Author: New York State Electric and Gas Corporation
Publisher:
Total Pages:
Release: 2000
Genre: Coal-tar
ISBN:

Download Interim Remedial Measures Citizen Participation Plan for Activities at Ithaca Court Street Former Manufactured Gas Plant (MGP) Site, City of Ithaca, Tompkins County, New York Book in PDF, Epub and Kindle

Work plan for clean up of coal tar, coal tar soils and coal tar contaminated water in two subsurface concrete structures formerly operated by the New York State Electric and Gas Corporation and used as gas holders until 1927. These structures are located on land bordering ther corner of North Plain Street and West Court Street in Ithaca, New York.

Interim Remedial Measures Work Plan for Activities at Ithaca Court Street Former MGP Site Subsurface Wooden Duct Extension, City of Ithaca, Tompkins County, New York

Interim Remedial Measures Work Plan for Activities at Ithaca Court Street Former MGP Site Subsurface Wooden Duct Extension, City of Ithaca, Tompkins County, New York
Author: New York State Electric and Gas Corporation
Publisher:
Total Pages:
Release: 2000
Genre: Coal-tar
ISBN:

Download Interim Remedial Measures Work Plan for Activities at Ithaca Court Street Former MGP Site Subsurface Wooden Duct Extension, City of Ithaca, Tompkins County, New York Book in PDF, Epub and Kindle

This is the work plan for the coal tar subsurface wooden duct removal proposed for the Ithaca Court Street Former Manufactured Gas Plant (MGP) Site located in the City of Ithaca, Tompkins County, New York. It involves excavation and disposal of free phase tar contained in the subsurface wooden duct and any coal tar soils around the duct. The plan describes the techniques to be utilized for the sampling, excavation, material handling, community air monitoring, waste characteriztion, transportation and disposal of MGP residues.

Interim Draft Remedial Investigation Report for Operable Unit-1

Interim Draft Remedial Investigation Report for Operable Unit-1
Author: MWH Americas, Inc
Publisher:
Total Pages:
Release: 2002
Genre: Coal-tar
ISBN:

Download Interim Draft Remedial Investigation Report for Operable Unit-1 Book in PDF, Epub and Kindle

This report relates the initial results of the fieldwork described in the Final Work Plan for a Supplemental Remedial Investigation at the Ithaca Court Street Former MGP Site, City of Ithaca, Tompkins County, New York. The study was divided into two Operable Units to expedite the investigation and evaluation of portions of the study area. Operable Unit No. 1 consists of the MGP property and the wooden duct that exists beneath West Court Street that was formerly used to transport coal tar to the Cayuga Inlet. This is an interim report which summarizes the activities conducted from October 2001 through March 2002 at Operable Unit-1 and presents a preliminary discussion of their results.

Supplemental Remedial Investigation Citizen Participation Plan for Activities at Ithaca Court Street Former Manufactured Gas Plant (MGP) Site, City of Ithaca, Tompkins County, New York

Supplemental Remedial Investigation Citizen Participation Plan for Activities at Ithaca Court Street Former Manufactured Gas Plant (MGP) Site, City of Ithaca, Tompkins County, New York
Author: New York State Electric and Gas Corporation
Publisher:
Total Pages: 7
Release: 2001
Genre: Coal-tar
ISBN:

Download Supplemental Remedial Investigation Citizen Participation Plan for Activities at Ithaca Court Street Former Manufactured Gas Plant (MGP) Site, City of Ithaca, Tompkins County, New York Book in PDF, Epub and Kindle

Remedial Investigation Report for Operable Unit-1

Remedial Investigation Report for Operable Unit-1
Author: MWH Americas, Inc
Publisher:
Total Pages:
Release: 2003
Genre: Coal-tar
ISBN:

Download Remedial Investigation Report for Operable Unit-1 Book in PDF, Epub and Kindle

This report relates the results of the fieldwork described in the Final Work Plan for a Supplemental Remedial Investigation at the Ithaca Court Street Former MGP Site, City of Ithaca, Tompkins County, New York. The study was divided into two Operable Units to expedite the investigation and evaluation of portions of the study area. Operable Unit No. 1 consists of the MGP property and the wooden duct that exists beneath West Court Street that was formerly used to transport coal tar to the Cayuga Inlet.