Installation Restoration Program. Final Remedial Investigation Report. Volume II. Appendix A-L: 120th Fighter Wing, Montana Air National Guard, Great Falls International Airport, Great Falls, Montana

Installation Restoration Program. Final Remedial Investigation Report. Volume II. Appendix A-L: 120th Fighter Wing, Montana Air National Guard, Great Falls International Airport, Great Falls, Montana
Author:
Publisher:
Total Pages: 491
Release: 1997
Genre:
ISBN:

Download Installation Restoration Program. Final Remedial Investigation Report. Volume II. Appendix A-L: 120th Fighter Wing, Montana Air National Guard, Great Falls International Airport, Great Falls, Montana Book in PDF, Epub and Kindle

Installation Restoration Program. Final Remedial Investigation Report. Volume I. 120th Fighter Wing, Montana Air National Guard, Great Falls International Airport, Great Falls, Montana

Installation Restoration Program. Final Remedial Investigation Report. Volume I. 120th Fighter Wing, Montana Air National Guard, Great Falls International Airport, Great Falls, Montana
Author:
Publisher:
Total Pages: 179
Release: 1997
Genre:
ISBN:

Download Installation Restoration Program. Final Remedial Investigation Report. Volume I. 120th Fighter Wing, Montana Air National Guard, Great Falls International Airport, Great Falls, Montana Book in PDF, Epub and Kindle

A Remedial Investigation was conducted at the Great Falls Air National Guard Base during April, May, and July 1996. During the period four IRP sites were investigated (IRP Sites 1, 6, 7, and 8). The investigation consisted of drilling 14 soil borings and installing 10 monitoring wells. At Sites 1 and 6, no contaminants in the soil or groundwater were found above State and Federal cleanup levels; and a Decision Document to support no further action is recommended. At Sites 7 and 8, no contaminants were found in the soil above State and Federal cleanup levels; and a Decision Document to support no further action with respect to soil contamination is recommended. At Sites 7 and 8, groundwater contamination above State and Federal cleanup levels was detected. The contamination included petroleum hydrocarbons, chlorinated solvents, and dissolved metals. It is recommended that an Engineering Evaluation/Cost Analysis be prepared to evaluate remedial alternatives for the groundwater at Sites 7 and 8.

Remedial Investigation Report. Volume I. 120th Fighter Wing Montana Air National Guard Great Falls International Airport Great Falls, Montana

Remedial Investigation Report. Volume I. 120th Fighter Wing Montana Air National Guard Great Falls International Airport Great Falls, Montana
Author:
Publisher:
Total Pages: 179
Release: 1997
Genre:
ISBN:

Download Remedial Investigation Report. Volume I. 120th Fighter Wing Montana Air National Guard Great Falls International Airport Great Falls, Montana Book in PDF, Epub and Kindle

A Remedial Investigation was conducted at the Great Falls Air National Guard Base during April, May, and July 1996. During the period four IRP sites were investigated (IRP Sites 1, 6, 7, and 8). The investigation consisted of drilling 14 soil borings and installing 10 monitoring wells. At Sites 1 and 6, no contaminants in the soil or groundwater were found above State and Federal cleanup levels; and a Decision Document to support no further action is recommended. At Sites 7 and 8, no contaminants were found in the soil above State and Federal cleanup levels; and a Decision Document to support no further action with respect to soil contamination is recommended. At Sites 7 and 8, groundwater contamination above State and Federal cleanup levels was detected. The contamination included petroleum hydrocarbons, chlorinated solvents, and dissolved metals. It is recommended that an Engineering Evaluation/Cost Analysis be prepared to evaluate remedial alternatives for the groundwater at Sites 7 and 8.

Remedial Investigation Report. Volume II. Appendix A-L, 120th Fighter Wing Montana Air National Guard Great Falls International Airport Great Falls, Montana

Remedial Investigation Report. Volume II. Appendix A-L, 120th Fighter Wing Montana Air National Guard Great Falls International Airport Great Falls, Montana
Author:
Publisher:
Total Pages: 494
Release: 1997
Genre:
ISBN:

Download Remedial Investigation Report. Volume II. Appendix A-L, 120th Fighter Wing Montana Air National Guard Great Falls International Airport Great Falls, Montana Book in PDF, Epub and Kindle

A Remedial Investigation was conducted at the Great Falls Air National Guard Base during April, May, and July 1996. During the period four IRP sites were investigated (IRP Sites 1, 6, 7, and 8) . The investigation consisted of drilling 14 soil borings and installing 10 monitoring wells. At Sites 1 and 6, no contaminants in the soil or groundwater were found above State and Federal cleanup levels; and a Decision Document to support no further action is recommended. At Sites 7 and 8, no contaminants were found in the soil above State and Federal cleanup levels; and a Decision Document to support no further action with respect to soil contamination is recommended. At Sites 7 and 8, groundwater contamination above State and Federal cleanup levels was detected. The contamination included petroleum hydrocarbons, chlorinated solvents, and dissolved metals. It is recommended that an Engineering Evaluation/Cost Analysis be prepared to evaluate remedial alternatives for the groundwater at Sites 7 and 8.

Installation Restoration Program. Preliminary Assessment: 120th Fighter Interceptor Group, Montana Air National Guard, Great Falls International Airport, Great Falls, Montana

Installation Restoration Program. Preliminary Assessment: 120th Fighter Interceptor Group, Montana Air National Guard, Great Falls International Airport, Great Falls, Montana
Author:
Publisher:
Total Pages: 91
Release: 1988
Genre:
ISBN:

Download Installation Restoration Program. Preliminary Assessment: 120th Fighter Interceptor Group, Montana Air National Guard, Great Falls International Airport, Great Falls, Montana Book in PDF, Epub and Kindle

Preliminary Assessment of suspected hazardous waste sites at the Montana Air National Guard, Great Falls International Airport, Great Falls, Montana. The study was conducted under the Air National Guard's Installation Restoration Program.

Installation Restoration Program, Engineering Evaluation/Cost Analysis Field Investigation Work Plan - IRP Sites No. 7 and No. 8, 120th Montana Air National Guard, Great Falls, Montana

Installation Restoration Program, Engineering Evaluation/Cost Analysis Field Investigation Work Plan - IRP Sites No. 7 and No. 8, 120th Montana Air National Guard, Great Falls, Montana
Author:
Publisher:
Total Pages: 229
Release: 1997
Genre:
ISBN:

Download Installation Restoration Program, Engineering Evaluation/Cost Analysis Field Investigation Work Plan - IRP Sites No. 7 and No. 8, 120th Montana Air National Guard, Great Falls, Montana Book in PDF, Epub and Kindle

A field Investigation will be conducted at IRP Sites No. 7 (Dry Well off Corrosion Control Building) and No. 8 (Dry Well off Composite Maintenance Building), Montana Air National Guard, Great Falls International Airport, Great Falls, Montana. The Remedial Investigation (RI), completed in May 1997, recommended that an Engineering Evaluation/Cost Analysis be performed at Sites 7 and 8 to determine the significance of the groundwater contamination, and what remedial measures, if any, should be taken. The field investigation will consist of installing four (4) monitoring wells at each site, collecting and analyzing groundwater from each well, and measuring hydraulic properties of the groundwater. The objectives of this investigation will be to assess the extent of groundwater contamination, to determine the potential risk of the contamination to human health and the environment, and to evaluate removal action alternatives.

Government Reports Annual Index

Government Reports Annual Index
Author:
Publisher:
Total Pages: 1400
Release: 1992
Genre: Government publications
ISBN:

Download Government Reports Annual Index Book in PDF, Epub and Kindle