Draft General Design Memorandum and Environmental Impact Statement Supplement, Grays Harbor, Washington, Navigation Improvement Project, Chehalis and Hoquiam Rivers

Draft General Design Memorandum and Environmental Impact Statement Supplement, Grays Harbor, Washington, Navigation Improvement Project, Chehalis and Hoquiam Rivers
Author: United States. Army. Corps of Engineers. Seattle District
Publisher:
Total Pages:
Release: 1988
Genre: Dredging
ISBN:

Download Draft General Design Memorandum and Environmental Impact Statement Supplement, Grays Harbor, Washington, Navigation Improvement Project, Chehalis and Hoquiam Rivers Book in PDF, Epub and Kindle

Grays Harbor and Chehalis River, Wash

Grays Harbor and Chehalis River, Wash
Author: United States. Army. Corps of Engineers
Publisher:
Total Pages: 42
Release: 1954
Genre: Breakwaters
ISBN:

Download Grays Harbor and Chehalis River, Wash Book in PDF, Epub and Kindle

Interim Feasibility Report and Draft Environmental Impact Statement, Grays Harbor, Chehalis and Hoquiam Rivers, Washington, Channel Improvements for Navigation

Interim Feasibility Report and Draft Environmental Impact Statement, Grays Harbor, Chehalis and Hoquiam Rivers, Washington, Channel Improvements for Navigation
Author: CORPS OF ENGINEERS SEATTLE WA SEATTLE DISTRICT.
Publisher:
Total Pages: 520
Release: 1982
Genre:
ISBN:

Download Interim Feasibility Report and Draft Environmental Impact Statement, Grays Harbor, Chehalis and Hoquiam Rivers, Washington, Channel Improvements for Navigation Book in PDF, Epub and Kindle

The study determined the need for and feasibility of improving the safety and efficiency of deep-draft water in Grays Harbor, Washington. Features of the tentatively recommended plan include the following: (1) 24.3 miles of channel improvement form the outer bar through the harbor entrance and estuary past the city of Aberdeen and up the Chehalis River to the town of Cosmopolis (Authorized chanel depth would range from 46 feet at the outer bar and entrance to 38 feet through the estuary to Port of Grays Harbor terminals at Aberdeen and 36 feet above port terminals to Cosmopolis); (2) Replacement of the Union Pacific Railrod (UPRR) bridge at Aberdeen; (3) Construction of three turning basins (Hoquiam, Cow Point-Aberdeen, Elliott Slough above UPRR Bridge); (4) Mitigation of 4 acres of lost shallow water fish feeding habitat; (5) Mitigation through dredge modification to avoid increased juvenile and adult crab mortalities from dredging; (6) Improved aids to navigation; (7) Open-water disposal of dredged material at the harbor entrance (Point Chehalis and South Jetty sites) and in the ocean (about 3 1/2 miles from the harbor entrance).