Download Geothermal Loan Guarantee Program: Westmorland Development Project, Imperial County, California: Environmental Assessment Book in PDF, Epub and Kindle

The action assessed is the guaranty of a loan by DOE to finance geothermal exploration, development, and testing by Mapco Geothermal, Inc. and Republic Geothermal, Inc. in the Westmorland area of Imperial County, California. Initial drilling and flow testing of up to three production wells will occur in the exploratory phase. Exploration is proposed for either or both of two portions of the leasehold area. If exploration confirms the presence of a viable resource in the Sweetwater area, the preferred site based on limited temperature data, then up to 19 new production wells and three new injection wells may be drilled and tested there in preparation for the construction of a 55-MW double-flash electric power plant. If, however, the Sweetwater resource proves infeasible, further exploration and possible full-field development may occur instead at the Dearborn-Kalin-Landers area. At this site, up to 19 new production wells and three new injection wells may be drilled and tested, with six existing wells also used for injection. This environmental assessment chiefly addresses effects of the drilling and testing program. In summary, this paper discusses the proposed action, describes the existing environment and discusses the potential environmental impacts. 75 refs. (LSP).

Geothermal Loan Guarantee Program

Geothermal Loan Guarantee Program
Author:
Publisher:
Total Pages:
Release: 1979
Genre:
ISBN:

Download Geothermal Loan Guarantee Program Book in PDF, Epub and Kindle

The action assessed is the guaranty of a loan by DOE to finance geothermal exploration, development, and testing by Mapco Geothermal, Inc. and Republic Geothermal, Inc. in the Westmorland area of Imperial County, California. Initial drilling and flow testing of up to three production wells will occur in the exploratory phase. Exploration is proposed for either or both of two portions of the leasehold area. If exploration confirms the presence of a viable resource in the Sweetwater area, the preferred site based on limited temperature data, then up to 19 new production wells and three new injection wells may be drilled and tested there in preparation for the construction of a 55-MW double-flash electric power plant. If, however, the Sweetwater resource proves infeasible, further exploration and possible full-field development may occur instead at the Dearborn-Kalin-Landers area. At this site, up to 19 new production wells and three new injection wells may be drilled and tested, with six existing wells also used for injection. This environmental assessment chiefly addresses effects of the drilling and testing program. In summary, this paper discusses the proposed action, describes the existing environment and discusses the potential environmental impacts. 75 refs. (LSP).

Niland Development Project Geothermal Loan Guaranty: 49-MW (net) Power Plant and Geothermal Well Field Development, Imperial County, California: Environmental Assessment

Niland Development Project Geothermal Loan Guaranty: 49-MW (net) Power Plant and Geothermal Well Field Development, Imperial County, California: Environmental Assessment
Author:
Publisher:
Total Pages:
Release: 2005
Genre:
ISBN:

Download Niland Development Project Geothermal Loan Guaranty: 49-MW (net) Power Plant and Geothermal Well Field Development, Imperial County, California: Environmental Assessment Book in PDF, Epub and Kindle

The proposed federal action addressed by this environmental assessment is the authorization of disbursements under a loan guaranteed by the US Department of Energy for the Niland Geothermal Energy Program. The disbursements will partially finance the development of a geothermal well field in the Imperial Valley of California to supply a 25-MW(e) (net) power plant. Phase I of the project is the production of 25 MW(e) (net) of power; the full rate of 49 MW (net) would be achieved during Phase II. The project is located on approximately 1600 acres (648 ha) near the city of Niland in Imperial County, California. Well field development includes the initial drilling of 8 production wells for Phase I, 8 production wells for Phase II, and the possible need for as many as 16 replacement wells over the anticipated 30-year life of the facility. Activities associated with the power plant in addition to operation are excavation and construction of the facility and associated systems (such as cooling towers). Significant environmental impacts, as defined in Council on Environmental Quality regulation 40 CFR Part 1508.27, are not expected to occur as a result of this project. Minor impacts could include the following: local degradation of ambient air quality due to particulate and/or hydrogen sulfide emissions, temporarily increased ambient noise levels due to drilling and construction activities, and increased traffic. Impacts could be significant in the event of a major spill of geothermal fluid, which could contaminate groundwater and surface waters and alter or eliminate nearby habitat. Careful land use planning and engineering design, implementation of mitigation measures for pollution control, and design and implementation of an environmental monitoring program that can provide an early indication of potential problems should ensure that impacts, except for certain accidents, will be minimized.

The Geothermal Loan Guarantee Program

The Geothermal Loan Guarantee Program
Author: United States. General Accounting Office
Publisher:
Total Pages: 56
Release: 1980
Genre: Energy development
ISBN:

Download The Geothermal Loan Guarantee Program Book in PDF, Epub and Kindle

Niland Development Project Geothermal Loan Guaranty

Niland Development Project Geothermal Loan Guaranty
Author:
Publisher:
Total Pages:
Release: 1984
Genre:
ISBN:

Download Niland Development Project Geothermal Loan Guaranty Book in PDF, Epub and Kindle

The proposed federal action addressed by this environmental assessment is the authorization of disbursements under a loan guaranteed by the US Department of Energy for the Niland Geothermal Energy Program. The disbursements will partially finance the development of a geothermal well field in the Imperial Valley of California to supply a 25-MW(e) (net) power plant. Phase I of the project is the production of 25 MW(e) (net) of power; the full rate of 49 MW (net) would be achieved during Phase II. The project is located on approximately 1600 acres (648 ha) near the city of Niland in Imperial County, California. Well field development includes the initial drilling of 8 production wells for Phase I, 8 production wells for Phase II, and the possible need for as many as 16 replacement wells over the anticipated 30-year life of the facility. Activities associated with the power plant in addition to operation are excavation and construction of the facility and associated systems (such as cooling towers). Significant environmental impacts, as defined in Council on Environmental Quality regulation 40 CFR Part 1508.27, are not expected to occur as a result of this project. Minor impacts could include the following: local degradation of ambient air quality due to particulate and/or hydrogen sulfide emissions, temporarily increased ambient noise levels due to drilling and construction activities, and increased traffic. Impacts could be significant in the event of a major spill of geothermal fluid, which could contaminate groundwater and surface waters and alter or eliminate nearby habitat. Careful land use planning and engineering design, implementation of mitigation measures for pollution control, and design and implementation of an environmental monitoring program that can provide an early indication of potential problems should ensure that impacts, except for certain accidents, will be minimized.