Feasibility of Serving the Kern County Water Agency From the State Water Project (Classic Reprint)

Feasibility of Serving the Kern County Water Agency From the State Water Project (Classic Reprint)
Author: California; Dept; Of Water Resources
Publisher:
Total Pages: 84
Release: 2015-07-06
Genre: Business & Economics
ISBN: 9781330838846

Download Feasibility of Serving the Kern County Water Agency From the State Water Project (Classic Reprint) Book in PDF, Epub and Kindle

Excerpt from Feasibility of Serving the Kern County Water Agency From the State Water Project In November 1960, the California Water Resources Development Bond Act was approved by the State's electorate, paving the way for the construction of the State Water Project as the first phase of the California Water Plan. Since that time, many local water service agencies throughout the State have applied to the Department of Water Resources for consideration as potential contractors with the State for water service from the proposed facilities. Several water agencies have been organized since November 1960 expressly for the purpose of obtaining supplemental water supplies from the state facilities for the areas they represent. Prior to executing water supply contracts with water agencies, the Department of Water Resources makes studies of those agencies and the areas encompassed by them to determine the propriety of entering into such contracts. These studies are made with the goal of evaluating (1) each area's future demand for supplemental water supplies, (2) the legal ability of each agency in question to enter into a water supply contract with the State, (3) the engineering feasibility of providing the proposed water service, and (4) the financial ability of the agency contracting for a supplemental water supply from the State Water Project. About the Publisher Forgotten Books publishes hundreds of thousands of rare and classic books. Find more at www.forgottenbooks.com This book is a reproduction of an important historical work. Forgotten Books uses state-of-the-art technology to digitally reconstruct the work, preserving the original format whilst repairing imperfections present in the aged copy. In rare cases, an imperfection in the original, such as a blemish or missing page, may be replicated in our edition. We do, however, repair the vast majority of imperfections successfully; any imperfections that remain are intentionally left to preserve the state of such historical works.

Feasibility of Serving the Plumas County Flood Control and Water Conservation District From the State Water Project (Classic Reprint)

Feasibility of Serving the Plumas County Flood Control and Water Conservation District From the State Water Project (Classic Reprint)
Author: California Department Of Wate Resources
Publisher: Forgotten Books
Total Pages: 70
Release: 2018-02-23
Genre: Business & Economics
ISBN: 9780282284190

Download Feasibility of Serving the Plumas County Flood Control and Water Conservation District From the State Water Project (Classic Reprint) Book in PDF, Epub and Kindle

Excerpt from Feasibility of Serving the Plumas County Flood Control and Water Conservation District From the State Water Project In November 1960, the California Water Resources Development Bond Act was approved by the State's electorate, paving the way for the construction of the State Water Project. Since that time, many local water service agencies throughout the state have applied to the Department of Water Resources for consideration as potential contractors with the State for water service from the proposed facilities. Several water agencies have been organized and formed since November 1960 expressly for the purpose of obtaining supplemental water supplies from the State facilities for the areas they represent. Prior to executing contracts for a water supply with public agencies, the Department of Water Resources made studies of those agencies and the areas encompassed by them to determine the propriety of entering into such contracts. These studies were made with the goal of evala ating (1) each area's future demand for supplemental water supplies, (2) the legal ability of each agency in question to enter into a water supply contract with the State, (3) the engineering feasibility of providing the proposed water service, and (4) the financial ability of each agency and its constituent area to bear the financial burden necessarily imposed upon it by a water supply contract with the State. About the Publisher Forgotten Books publishes hundreds of thousands of rare and classic books. Find more at www.forgottenbooks.com This book is a reproduction of an important historical work. Forgotten Books uses state-of-the-art technology to digitally reconstruct the work, preserving the original format whilst repairing imperfections present in the aged copy. In rare cases, an imperfection in the original, such as a blemish or missing page, may be replicated in our edition. We do, however, repair the vast majority of imperfections successfully; any imperfections that remain are intentionally left to preserve the state of such historical works.

Feasibility of Serving the Crestline-Lake Arrowhead Water Agency Area From the State Water Project

Feasibility of Serving the Crestline-Lake Arrowhead Water Agency Area From the State Water Project
Author:
Publisher:
Total Pages: 100
Release: 2015-08-05
Genre: Business & Economics
ISBN: 9781332260911

Download Feasibility of Serving the Crestline-Lake Arrowhead Water Agency Area From the State Water Project Book in PDF, Epub and Kindle

Excerpt from Feasibility of Serving the Crestline-Lake Arrowhead Water Agency Area From the State Water Project: February 1965 In November 1960 the California Water Resources Development Bond Act was approved by the State's electorate, paving the way for the construction of the State Water Project as the first phase of the California Water Plan. The Department of Water Resources was subsequently asked by representatives of the Crestline-Ike Arrowhead area to consider the area as a potential contractor for water from the State Water Project. A preliminary investigation of the Crestline-lake Arrowhead area was conducted by the Department and the results published in 1961 as a Report on Feasibility of Serving the Crestline-Lake Arrowhead Area from the State Water Facilities. This report recommended that the persons residing in the investigational area undertake to either annex the area to a water district having the necessary operative powers to import and distribute water or to form an overall water agency that would have these powers, and that this agency then negotiate with the State for a water supply contract. The Crestline-lake Arrowhead Water Agency was created by the California State Legislature in 1962 and entered into a water supply contract with the State of California on June 22, 1963. Prior to executing contracts for water service with water eigencies, the Department of Water Resources makes studies of those agencies and the areas encompassed by them in order to evaluate each areas future demand for supplementau Lwater supplies, the legal right of each agency to enter into such a contract, the engineering feasibility and economic justification of providing such service, and the financial ability of each agency and its constituent area to meet the financial requirement which would be imposed upon it by a water service contract with the State. About the Publisher Forgotten Books publishes hundreds of thousands of rare and classic books. Find more at www.forgottenbooks.com This book is a reproduction of an important historical work. Forgotten Books uses state-of-the-art technology to digitally reconstruct the work, preserving the original format whilst repairing imperfections present in the aged copy. In rare cases, an imperfection in the original, such as a blemish or missing page, may be replicated in our edition. We do, however, repair the vast majority of imperfections successfully; any imperfections that remain are intentionally left to preserve the state of such historical works.

Feasibility of Serving the Mojave Water Agency From the State Water Project

Feasibility of Serving the Mojave Water Agency From the State Water Project
Author:
Publisher:
Total Pages: 108
Release: 2015-08-05
Genre: Business & Economics
ISBN: 9781332260898

Download Feasibility of Serving the Mojave Water Agency From the State Water Project Book in PDF, Epub and Kindle

Excerpt from Feasibility of Serving the Mojave Water Agency From the State Water Project: December 1965 In November 1960, the California Water Resources Development Bond Act, (Chapter 6 (commencing with Section 129), Part 6, Division 6 of the Main Code) was approved by the States electorate, paving the way for the construction of the State Water Project. Since that time, many local water service agencies throughout the State have applied to the Department of Water Resources for consideration as potential contractors with the State for water service from the proposed facilities. Several water agencies have been organized and formed since November 1960 expressly for the purpose of obtaining supplemental water supplies from the State facilities for the areas they represent. Prior to executing contracts for water service with public agencies, the Department of Water Resources made studies of those agencies and the areas encompassed by them to determine the propriety of entering into such contracts. These studies were made with the goal of evaluating (l)each areas future demand for supplemental water supplies; (2) the legal ability of each agency in question to enter into a water supply contract with the State; (3) the engineering feasibility of providing the proposed water service; (4) the financial ability of each agency and its constituent area to bear the financial burden necessarily imposed upon it by a water supply contract with the State. The results of the studies made for each agency, along with significant incidental and supporting material, have been embodied in separate reports which have or will be published by the Department of Water Resources for the benefit of interested agencies and persons. This bulletin, dealing with the Mojave Water Agency, the Morongo Valley Community Services District, and the Yucca Valley-Joshua Tree territory in San Bernardino County, is one of a series of such publications. About the Publisher Forgotten Books publishes hundreds of thousands of rare and classic books. Find more at www.forgottenbooks.com This book is a reproduction of an important historical work. Forgotten Books uses state-of-the-art technology to digitally reconstruct the work, preserving the original format whilst repairing imperfections present in the aged copy. In rare cases, an imperfection in the original, such as a blemish or missing page, may be replicated in our edition. We do, however, repair the vast majority of imperfections successfully; any imperfections that remain are intentionally left to preserve the state of such historical works.

Feasibility of Serving the Oak Flat Water District From the State Water Project (Classic Reprint)

Feasibility of Serving the Oak Flat Water District From the State Water Project (Classic Reprint)
Author: California Department Of Wate Resources
Publisher: Forgotten Books
Total Pages: 64
Release: 2018-02-21
Genre: Reference
ISBN: 9780666080752

Download Feasibility of Serving the Oak Flat Water District From the State Water Project (Classic Reprint) Book in PDF, Epub and Kindle

Excerpt from Feasibility of Serving the Oak Flat Water District From the State Water Project Resources. This bulletin is one of a series of suchpublications and describes studies which led to the signing of a contract with the Oak Flat Water District on March 23. About the Publisher Forgotten Books publishes hundreds of thousands of rare and classic books. Find more at www.forgottenbooks.com This book is a reproduction of an important historical work. Forgotten Books uses state-of-the-art technology to digitally reconstruct the work, preserving the original format whilst repairing imperfections present in the aged copy. In rare cases, an imperfection in the original, such as a blemish or missing page, may be replicated in our edition. We do, however, repair the vast majority of imperfections successfully; any imperfections that remain are intentionally left to preserve the state of such historical works.

Feasibility of Serving the Napa County Flood Control and Water Conservation District from the State Water Project (Classic Reprint)

Feasibility of Serving the Napa County Flood Control and Water Conservation District from the State Water Project (Classic Reprint)
Author: California Department of Wate Resources
Publisher: Forgotten Books
Total Pages: 112
Release: 2018-12-22
Genre: Business & Economics
ISBN: 9780656464999

Download Feasibility of Serving the Napa County Flood Control and Water Conservation District from the State Water Project (Classic Reprint) Book in PDF, Epub and Kindle

Excerpt from Feasibility of Serving the Napa County Flood Control and Water Conservation District From the State Water Project American Canyon County Water District Costs chapter V. Economic justification and financial feasibility Economic Justification Financial Feasibility Present and Projected Assessed valuation Present and Projected Total Indebtedness Ad valorem Taxes Capability to Meet Contract Obligations Effect Upon Indebtedness. About the Publisher Forgotten Books publishes hundreds of thousands of rare and classic books. Find more at www.forgottenbooks.com This book is a reproduction of an important historical work. Forgotten Books uses state-of-the-art technology to digitally reconstruct the work, preserving the original format whilst repairing imperfections present in the aged copy. In rare cases, an imperfection in the original, such as a blemish or missing page, may be replicated in our edition. We do, however, repair the vast majority of imperfections successfully; any imperfections that remain are intentionally left to preserve the state of such historical works.

The California State Water Project, Vol. 2

The California State Water Project, Vol. 2
Author:
Publisher: Forgotten Books
Total Pages: 598
Release: 2018-02-25
Genre: Reference
ISBN: 9780666373090

Download The California State Water Project, Vol. 2 Book in PDF, Epub and Kindle

Excerpt from The California State Water Project, Vol. 2: Water Supply Contracts Tulare Lake Basin Water Storage District Upper Santa Clara valley Water Agency 'ventura County Flood Control District. About the Publisher Forgotten Books publishes hundreds of thousands of rare and classic books. Find more at www.forgottenbooks.com This book is a reproduction of an important historical work. Forgotten Books uses state-of-the-art technology to digitally reconstruct the work, preserving the original format whilst repairing imperfections present in the aged copy. In rare cases, an imperfection in the original, such as a blemish or missing page, may be replicated in our edition. We do, however, repair the vast majority of imperfections successfully; any imperfections that remain are intentionally left to preserve the state of such historical works.