Evaluation of Capping Operations at the Experimental Mud Dump Site, N.Y. Bight Apex, 1980

Evaluation of Capping Operations at the Experimental Mud Dump Site, N.Y. Bight Apex, 1980
Author: Joseph M. O'Connor
Publisher:
Total Pages: 70
Release: 1982
Genre: Dredging spoil
ISBN:

Download Evaluation of Capping Operations at the Experimental Mud Dump Site, N.Y. Bight Apex, 1980 Book in PDF, Epub and Kindle

Conflicting, multiple uses of the New York Bight impose various stresses on its physical and biological resources. Ocean disposal of waste poses a management problem which is regulated by no fewer than four pieces of Federal legislation and several state and federal regulatory agencies. Dredged material disposal in the New York Bight is regulated by the U.S. Army Corps of Engineers. Current regulations dictate that contaminated waste dredged material be given special treatment. The special treatment discussed in this synthesis report is the capping of contaminated waste dredged material with clean material to minimize transport of toxicants from the sediment to marine biota.

Dredging Operations Technical Support Program. Evaluation of the 1980 Capping Operations at the Experimental Mud Dump Site, New York Bight Apex

Dredging Operations Technical Support Program. Evaluation of the 1980 Capping Operations at the Experimental Mud Dump Site, New York Bight Apex
Author: J. M. O'Connor
Publisher:
Total Pages: 78
Release: 1983
Genre:
ISBN:

Download Dredging Operations Technical Support Program. Evaluation of the 1980 Capping Operations at the Experimental Mud Dump Site, New York Bight Apex Book in PDF, Epub and Kindle

The objective of the project was to assess the potential for placing a cap at the experimental Mud Dump site and to determine reductions in environmental impacts related to capping. Contaminated sediment from dredging projects in the Hudson Estuary, Newark Bay, and contiguous waters were capped first with fine sediments from the Bronx River and Westchester Creek, then with sand from the Ambrose Channel. The capping resulted in a layer of sand about 1m thick lying atop the contaminated sediment. Physical, chemical and biological studies were carried out to determine if the capping effort yielded an intact cap showing resistance to erosion, and if the effort reduced loss of organic and inorganic toxicants from the contaminated material to the water column. It was determined that a cap was successfully placed at the experimental dump site. The cap was still intact and in place after 16 months. Cap erosion was minor; predictions of cap life were in excess of 20 years under normal meteorological conditions. Major storm events, however, are capable of eroding the cap and exposing the contaminated material. During the 16 months of study, the contaminated material decreased in volume by about 4%. Part of the decrease was due to compaction and part was due to loss of solids during dumping and deposition.

New York Bight Study

New York Bight Study
Author:
Publisher:
Total Pages: 260
Release: 1994
Genre: Aquatic biology
ISBN:

Download New York Bight Study Book in PDF, Epub and Kindle