Eastside Transit Corridor Study Los Angeles California
Download Eastside Transit Corridor Study Los Angeles California full books in PDF, epub, and Kindle. Read online free Eastside Transit Corridor Study Los Angeles California ebook anywhere anytime directly on your device. Fast Download speed and no annoying ads. We cannot guarantee that every ebooks is available!
Author | : Los Angeles County Metropolitan Transportation Authority |
Publisher | : |
Total Pages | : 102 |
Release | : 1999 |
Genre | : Local transit |
ISBN | : |
Download Eastside Transit Corridor Study, Los Angeles, California Book in PDF, Epub and Kindle
Author | : Los Angeles County Metropolitan Transportation Authority |
Publisher | : |
Total Pages | : 76 |
Release | : 2009* |
Genre | : Local transit |
ISBN | : |
Download Eastside Transit Corridor Phase 2 Study Book in PDF, Epub and Kindle
Author | : Los Angeles County Metropolitan Transportation Authority |
Publisher | : |
Total Pages | : |
Release | : 2000 |
Genre | : Local transit |
ISBN | : |
Download Eastside Transit Corridor Study Book in PDF, Epub and Kindle
Author | : |
Publisher | : |
Total Pages | : 562 |
Release | : 2001 |
Genre | : |
ISBN | : |
Download The Los Angeles Eastside Corridor Project Book in PDF, Epub and Kindle
Author | : Los Angeles County Metropolitan Transportation Authority |
Publisher | : |
Total Pages | : |
Release | : 2009 |
Genre | : Local transit |
ISBN | : |
Download Eastside Transit Corridor Phase 2 Study Book in PDF, Epub and Kindle
Author | : |
Publisher | : |
Total Pages | : 828 |
Release | : 1994 |
Genre | : |
ISBN | : |
Download Los Angeles Metro Red Line East Side Corridor Book in PDF, Epub and Kindle
Author | : CDM Smith |
Publisher | : |
Total Pages | : 0 |
Release | : 2017 |
Genre | : Bell (Calif.) |
ISBN | : |
Download Eastside Transit Corridor Phase 2 Book in PDF, Epub and Kindle
The purpose of this Technical Study is to address issues identified in the November 2014 Board Motion, which the Metro Board of Directors passed subsequent to the release for public review on August 22, 2014 of the Eastside Transit Corridor Phase 2 Draft Environmental Impact Statement/Environmental Impact Report (Draft EIS/EIR). The Draft EIS/EIR studied two Build Alternatives to extend the Metro Gold Line east of its current terminus at Atlantic Boulevard in East Los Angeles: the State Route (SR) 60 Light Rail Transit (LRT) Alternative and the Washington Boulevard LRT Alternative. Based on the volume and scope of comments received on the Draft EIS/EIR, the Board deferred the selection of a Locally Preferred Alternative (LPA) and determined that additional technical investigation would be needed to address major areas of concern raised by Cooperating Agencies, corridor cities and stakeholders. In addition, the Board directed staff to identify a new north-south connection for the Washington Boulevard LRT Alternative and explore the feasibility of operating both the SR 60 LRT and Washington Boulevard LRT Alternatives. This report describes the results of the technical analysis and associated refinements to the project alternatives. In addition, it summarizes feedback received at community meetings, implications on the project scope and presents additional considerations for project implementation, including funding and environmental next steps. The final section presents recommendations for an updated Project Definition for Metro Board consideration.
Author | : Barrio Planners Incorporated |
Publisher | : |
Total Pages | : |
Release | : 1999 |
Genre | : Local transit |
ISBN | : |
Download Urban Design Concept Report Book in PDF, Epub and Kindle
Author | : Southern California Association of Governments |
Publisher | : |
Total Pages | : |
Release | : 1998 |
Genre | : East Los Angeles (Calif.) |
ISBN | : |
Download Gold Line East Side Extension Book in PDF, Epub and Kindle
The purpose of this study is to document the supporting data and explore potential alternatives that will meet the mobility accessibilty and equity goals of the population within the study area, in the absence of East Side Extension of the Metro Red Line.
Author | : Arellano Associates |
Publisher | : |
Total Pages | : |
Release | : 2010 |
Genre | : Local transit |
ISBN | : |
Download Eastside Transit Corridor Phase 2 Book in PDF, Epub and Kindle
"The Eastside Transit Corridor Phase 2 Project is located in Eastern Los Angeles County and is generally bounded by Pomona Boulevard and State Route 60 (SR-60) Freeway to the north, Peck Road and Painter Avenue to the east, Olympic and Washington Boulevards to the south, and Atlantic Boulevard to the west. The project area consists of portions of eight jurisdictions, including the cities of Commerce, Montebello, Monterey Park, Pico Rivera, Rosemead, Santa Fe Springs, South El Monte, Whittier and portions of unincorporated Los Angeles County"--Executive Summary introduction.