Ellenville Wind Energy Project

Ellenville Wind Energy Project
Author: Bagdon Environmental Associates
Publisher:
Total Pages: 138
Release: 1984
Genre: Electric power production
ISBN:

Download Ellenville Wind Energy Project Book in PDF, Epub and Kindle

Ellenville Wind Energy Project

Ellenville Wind Energy Project
Author: Bagdon Environmental Associates
Publisher:
Total Pages:
Release: 1984
Genre: Electric power production
ISBN:

Download Ellenville Wind Energy Project Book in PDF, Epub and Kindle

Draft Environmental Impact Statement/environmental Impact Report (EIS/EIR) for the Granite Mountain Wind Energy Project

Draft Environmental Impact Statement/environmental Impact Report (EIS/EIR) for the Granite Mountain Wind Energy Project
Author:
Publisher:
Total Pages: 0
Release: 2008
Genre: Electric power distribution
ISBN:

Download Draft Environmental Impact Statement/environmental Impact Report (EIS/EIR) for the Granite Mountain Wind Energy Project Book in PDF, Epub and Kindle

Granite Wind LLC, the Applicant, is proposing to develop an up to 84-megawatt wind energy plant and associated facilities on about 100 acres within a larger 2,756-acre area that includes 2,086 acres of public lands administered by the BLM Barstow Field Office and 670 acres of privately-owned land under the County of San Bernardino land-use jurisdiction. The site of the Proposed Action is located on unincorporated land in the Mojave Desert, approximately six miles east of the Town of Apple Valley and five miles northwest of the unincorporated community of Lucerne Valley, on the central ridge of the Granite Mountains. Also included in the proposal are a new access road to the project site, a new transmission line from the project site to an existing 220kV Southern California Edison (SCE) transmission line located in a utility corridor east of the site, and a new approximately 10-acre electrical substation (Jasper Substation) at the site of the SCE interconnection. In addition, the proposal includes an amendment to the CDCA Plan that would designate the proposed site as suitable for wind energy generation and allow for Siting of approximately 1 mile of the new 3.2-to 4.7-mile transmission line from the project site to be located outside of a utility corridor.

Draft Environmental Impact Statement

Draft Environmental Impact Statement
Author: United States. Western Area Power Administration
Publisher:
Total Pages:
Release: 2012
Genre: Hermosa West Wind Energy Project
ISBN:

Download Draft Environmental Impact Statement Book in PDF, Epub and Kindle

Environmental Impact Statements

Environmental Impact Statements
Author: United States. Commission on Federal Paperwork
Publisher:
Total Pages: 68
Release: 1977
Genre: Environmental impact statements
ISBN:

Download Environmental Impact Statements Book in PDF, Epub and Kindle

Draft Plan Amendment & Draft Environmental Impact Statement, Environmental Impact Report for the Alta East Wind Project

Draft Plan Amendment & Draft Environmental Impact Statement, Environmental Impact Report for the Alta East Wind Project
Author:
Publisher:
Total Pages: 0
Release: 2008
Genre: Electric power distribution
ISBN:

Download Draft Plan Amendment & Draft Environmental Impact Statement, Environmental Impact Report for the Alta East Wind Project Book in PDF, Epub and Kindle

Granite Wind LLC, the Applicant, is proposing to develop an up to 84-megawatt wind energy plant and associated facilities on about 100 acres within a larger 2,756-acre area that includes 2,086 acres of public lands administered by the BLM Barstow Field Office and 670 acres of privately-owned land under the County of San Bernardino land-use jurisdiction. The site of the Proposed Action is located on unincorporated land in the Mojave Desert, approximately six miles east of the Town of Apple Valley and five miles northwest of the unincorporated community of Lucerne Valley, on the central ridge of the Granite Mountains. Also included in the proposal are a new access road to the project site, a new transmission line from the project site to an existing 220kV Southern California Edison (SCE) transmission line located in a utility corridor east of the site, and a new approximately 10-acre electrical substation (Jasper Substation) at the site of the SCE interconnection. In addition, the proposal includes an amendment to the CDCA Plan that would designate the proposed site as suitable for wind energy generation and allow for Siting of approximately 1 mile of the new 3.2-to 4.7-mile transmission line from the project site to be located outside of a utility corridor.