Final Environmental Impact Statement

Final Environmental Impact Statement
Author: United States. Department of Energy. Savannah River Operations Office
Publisher:
Total Pages:
Release: 1999
Genre: Particle accelerators
ISBN:

Download Final Environmental Impact Statement Book in PDF, Epub and Kindle

Draft Environmental Impact Statement

Draft Environmental Impact Statement
Author: United States. Department of Energy. Savannah River Operations Office
Publisher:
Total Pages:
Release: 1998
Genre: Particle accelerators
ISBN:

Download Draft Environmental Impact Statement Book in PDF, Epub and Kindle

Startup Status of the Replacement Tritium Facility at the Savannah River Site

Startup Status of the Replacement Tritium Facility at the Savannah River Site
Author:
Publisher:
Total Pages: 8
Release: 1993
Genre:
ISBN:

Download Startup Status of the Replacement Tritium Facility at the Savannah River Site Book in PDF, Epub and Kindle

Tritium processing operations have been performed at the Savannah River Site (SRS) since 1955. It was determined in the early 1980's that new tritium facilities were required in order to meet increasingly stringent safety and environmental requirements while maintaining productivity. Construction of a new tritium handling facility, the Replacement Tritium Facility (RTF), began in 1987. This new facility incorporates the latest technology and design philosophy to mitigate accident consequences, enhance operational safety, minimize tritium losses to the environment, and ensure material safeguards and security. The RTF is currently completing startup operations. This report details key features addressed during the design and startup of this facility.