Uranium Mill Tailings Remedial Action Project. 1995 Environmental Report

Uranium Mill Tailings Remedial Action Project. 1995 Environmental Report
Author:
Publisher:
Total Pages:
Release: 2001
Genre:
ISBN:

Download Uranium Mill Tailings Remedial Action Project. 1995 Environmental Report Book in PDF, Epub and Kindle

In accordance with U.S. Department of Energy (DOE) Order 23 1. 1, Environment, Safety and Health Reporting, the DOE prepares an annual report to document the activities of the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring program. This monitoring must comply with appropriate laws, regulations, and standards, and it must identify apparent and meaningful trends in monitoring results. The results of all monitoring activities must be communicated to the public. The UMTRA Project has prepared annual environmental reports to the public since 1989.

Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan
Author:
Publisher:
Total Pages: 50
Release: 1993
Genre:
ISBN:

Download Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan Book in PDF, Epub and Kindle

The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1. The UMTRA EPIP covers the time period of November 9, 1993, through November 8, 1994. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies. Contents of this report are: (1) general description of the UMTRA project environmental protection program; (2) notifications; (3) planning and reporting; (4) special programs; (5) environmental monitoring programs; (6) quality assurance and data verification; and (7) references.

Uranium Mill Tailings Remedial Action (UMTRA) Project. [UMTRA Project].

Uranium Mill Tailings Remedial Action (UMTRA) Project. [UMTRA Project].
Author:
Publisher:
Total Pages: 53
Release: 1989
Genre:
ISBN:

Download Uranium Mill Tailings Remedial Action (UMTRA) Project. [UMTRA Project]. Book in PDF, Epub and Kindle

The mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project is explicitly stated and directed in the Uranium Mill Tailings Radiation Control Act of 1978, hereinafter referred to as the Act.'' Title I of the Act authorizes the Department of Energy (DOE) to undertake remedial action at designated inactive uranium processing sites (Attachment 1 and 2) and associated vicinity properties containing uranium mill tailings and other residual radioactive materials derived from the processing site. The purpose of the remedial actions is to stabilize and control such uranium mill tailings and other residual radioactive materials in a safe and environmentally sound manner to minimize radiation health hazards to the public. The principal health hazards and environmental concerns are: the inhalation of air particulates contaminated as a result of the emanation of radon from the tailings piles and the subsequent decay of radon daughters; and the contamination of surface and groundwaters with radionuclides or other chemically toxic materials. This UMTRA Project Plan identifies the mission and objectives of the project, outlines the technical and managerial approach for achieving them, and summarizes the performance, cost, and schedule baselines which have been established to guide operational activity. Estimated cost increases by 15 percent, or if the schedule slips by six months. 4 refs.

Uranium Mill Tailings Remedial Action Project Annual Environmental Monitoring Report Calendar Year 1992

Uranium Mill Tailings Remedial Action Project Annual Environmental Monitoring Report Calendar Year 1992
Author:
Publisher:
Total Pages: 452
Release: 1993
Genre:
ISBN:

Download Uranium Mill Tailings Remedial Action Project Annual Environmental Monitoring Report Calendar Year 1992 Book in PDF, Epub and Kindle

This report describes environmental monitoring and compliance at eight UMTRA sites where remedial action was underway during 1992 and at the ten sites that were complete at the end of 1992. Volume I contains information for Ambrosia Lake, NM; Cannonsburg/Burrell, PA; Durango, CO; Falls City, TX; Grand Junction, CO; Green River, UT; and Gunnison, CO. Each site report contains a site description, compliance summary, environmental program information, environmental radiological and non-radiological program information, water resources protection, and quality assurance information.

Uranium Mill Tailings Remedial Action Project Annual Environmental Monitoring Report Calendar Year 1992

Uranium Mill Tailings Remedial Action Project Annual Environmental Monitoring Report Calendar Year 1992
Author:
Publisher:
Total Pages: 414
Release: 1993
Genre:
ISBN:

Download Uranium Mill Tailings Remedial Action Project Annual Environmental Monitoring Report Calendar Year 1992 Book in PDF, Epub and Kindle

This report contains environmental monitoring information for the following UMTRA sites for the 1992 Calendar Year: Lakeview, OR; Lowman, ID; Mexican Hat, UT; Monument Valley, AZ; Rifle, CO; Riverton, WY; Shiprock, NM; Spook, WY; Tuba City, AZ. Each site report contains a site description, compliance summary, environmental program information, environmental radiological and non-radiological program information, water resources protection, and quality assurance information.

Programmatic Environmental Report for Remedial Actions at UMTRA (Uranium Mill Tailings Remedial Action) Project Vicinity Properties

Programmatic Environmental Report for Remedial Actions at UMTRA (Uranium Mill Tailings Remedial Action) Project Vicinity Properties
Author:
Publisher:
Total Pages: 55
Release: 1985
Genre:
ISBN:

Download Programmatic Environmental Report for Remedial Actions at UMTRA (Uranium Mill Tailings Remedial Action) Project Vicinity Properties Book in PDF, Epub and Kindle

This Environmental Report (ER) examines the environmental consequences of implementing a remedial action that would remove radioactive uranium mill tailings and associated contaminated materials from 394 vicinity properties near 14 inactive uranium processing sites included in the Uranium Mill Tailings Remedial Action (UMTRA) Project pursuant to Public Law 95--604, the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978. Vicinity properties are those properties in the vicinity of the UMTRA Project inactive mill sites, either public or private, that are believed to be contaminated by residual radioactive material originating from one of the 14 inactive uranium processing sites, and which have been designated under Section 102(a)(1) of UMTRCA. The principal hazard associated with the contaminated properties results from the production of radon, a radioactive decay product of the radium contained in the tailings. Radon, a radioactive gas, can diffuse through the contaminated material and be released into the atmosphere where it and its radioactive decay products may be inhaled by humans. A second radiation exposure pathway results from the emission of gamma radiation from uranium decay products contained in the tailings. Gamma radiation emitted from contaminated material delivers an external exposure to the whole body. If the concentration of radon and its decay products is high enough and the exposure time long enough, or if the exposure to direct gamma radiation is long enough, cancers (i.e., excess health effects) may develop in persons living and working at the vicinity properties. 3 refs., 7 tabs.