Transition Projects FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP) WBS 1.3.1 and 7.1

Transition Projects FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP) WBS 1.3.1 and 7.1
Author:
Publisher:
Total Pages: 478
Release: 1994
Genre:
ISBN:

Download Transition Projects FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP) WBS 1.3.1 and 7.1 Book in PDF, Epub and Kindle

This reference contains information about the deactivation of the Purex Process Plant located on the Hanford Reservation. This document consists of a tabular schedule of events covering the next three years.

Planning Integration FY 1996 Program Plan. Revision 1

Planning Integration FY 1996 Program Plan. Revision 1
Author:
Publisher:
Total Pages:
Release: 2001
Genre:
ISBN:

Download Planning Integration FY 1996 Program Plan. Revision 1 Book in PDF, Epub and Kindle

This Multi-Year Program Plan (MAP) Planning Integration Program, Work Breakdown Structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes an agreement between RL and the performing contractors for the work to be performed. It was prepared by Westinghouse Hanford Company (WHC) and Pacific Northwest Laboratory (PNL). The MYPPs for the Hanford Site programs are to provide a picture from fiscal year (FY) 1996 through FY 2002. At RL Planning and Integration Division (PID) direction, only the FY 1996 Planning Integration Program work scope has been planned and presented in this MAP. Only those known significant activities which occur after FY 1996 are portrayed in this MAP. This is due to the uncertainty of who will be accomplishing what work scope when, following the award of the Management and Integration (M & I) contract.