Terminal Doppler Weather Radar Build 5A Operational Test and Evaluation (OT & E) Integration and OT & E Operational Test Plan

Terminal Doppler Weather Radar Build 5A Operational Test and Evaluation (OT & E) Integration and OT & E Operational Test Plan
Author:
Publisher:
Total Pages: 47
Release: 1994
Genre:
ISBN:

Download Terminal Doppler Weather Radar Build 5A Operational Test and Evaluation (OT & E) Integration and OT & E Operational Test Plan Book in PDF, Epub and Kindle

The Terminal Doppler Weather Radar (TDWR) Build 5A Enhancement Operational Test and Evaluation (OT & E) Integration and OT & E Operational Test Plan provides the overall philosophy and approach to Build 5A OT & E testing, and identifies OT & E objectives responsibilities, and resources. The TDWR Build 5A enhancement provides connectivity to the Low Level Wind Shear Alert System (LLWAS) II to display LLWAS II wind data along with TDWR hazardous weather data on TDWR Geographical Situation Displays (GSD) and Ribbon Display Terminals (RDT) . The TDWR Build 5A OT & E is scheduled to occur at the TDWR site in Memphis, TN, March through May 1994.

Terminal Doppler Weather Radar (TDWR) Build 5 Test and Evaluation Master Plan (TEMP).

Terminal Doppler Weather Radar (TDWR) Build 5 Test and Evaluation Master Plan (TEMP).
Author:
Publisher:
Total Pages: 84
Release: 1994
Genre:
ISBN:

Download Terminal Doppler Weather Radar (TDWR) Build 5 Test and Evaluation Master Plan (TEMP). Book in PDF, Epub and Kindle

This document presents the Terminal Doppler Weather Radar (TDWR), Build 5 enhancement, Test and Evaluation Master Plan (TEMP). This Build 5 TEMP identifies Operational Test and Evaluation (OT & E) objectives, responsibilities, resources, schedules, and critical test issues. The Build 5 enhancement consists of a Build 5A which provides connectivity to the Low Level Wind Shear Alert System (LLWAS) II, and a Build 5B which provides connectivity to an LLWAS III. Build 5A displays LLWAS II wind data along with TDWR hazardous weather data on TDWR Geographic Situation Displays (GSD) and Ribbon Display Terminals (RDT). Build 5B provides additional capabilities such as having a Microburst Shear Integration Algorithm (MSIA), TDWR/LLWAS III Integration Algorithm, 15-day archiving and TDWR, LLWAS II and LLWAS III data integration. Terminal Doppler Weather Radar (TDWR), Test and Evaluation Master Plan, Build 5, Operational Test and Evaluation (OT & E).