Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site at Mexican Hat, Utah

Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site at Mexican Hat, Utah
Author:
Publisher:
Total Pages: 137
Release: 1988
Genre:
ISBN:

Download Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site at Mexican Hat, Utah Book in PDF, Epub and Kindle

This Remedial Action Plan (RAP) has been developed to serve a two- fold purpose. It presents the activities proposed by the Department of Energy (DOE) to accomplish long-term stabilization and control of the residual radioactive materials (RRM) from Monument Valley Arizona, and Mexican Hat, Utah, at the Mexican Hat disposal site. It also serves to document the concurrence of both the Navajo Nation and the Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by DOE and the Navajo Nation and concurrence by the NRC, becomes Appendix B of the Cooperative Agreement. This document has been structured to provide a comprehensive understanding of the remedial action proposed for the Monument Valley and Mexican Hat sites. It includes specific design and construction requirements for the remedial action. Pertinent information and data are included with reference given to the supporting documents. Appendices A, B, and C are provided as part of this document. Appendix A presents regulatory compliance issues, Appendix B provides details of the engineering design, and Appendix C presents the radiological support plan.

Modification No. 2 to the Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site at Green River, Utah: Final

Modification No. 2 to the Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site at Green River, Utah: Final
Author:
Publisher:
Total Pages:
Release: 2001
Genre:
ISBN:

Download Modification No. 2 to the Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site at Green River, Utah: Final Book in PDF, Epub and Kindle

Portions of the final Remedial Action Plan (RAP) for the Green River site, Volumes 1 and 2, Appendix B of the Cooperative Agreement No. DE-FC04-81AL16257, March 1991 (DOE, 1991) have been modified. The changes to the RAP are designated as RAP Modification No. 2. These changes have been placed in a three-ring binder that will supplement the original RAP (DOE, 1991), and include the following: addendum to the Executive Summary; Section 3.5 (Ground Water part of the Site Characterization Summary); Section 4.0 (Site Design); Section5.0 (Water Resources Protection Strategy Summary); Appendix D.5 (Ground Water Hydrology); and Appendix E (Ground Water Protection Strategy). In addition to these revisions, there have been editorial changes that clarify the text, but do not change the meaning. Also, certain sections of the document, which are included in the submittal for ease of review and continuity, have been updated to reflect the final ground water protection standards and the current UMTRA Project format and content of RAPs.

Energy Research Abstracts

Energy Research Abstracts
Author:
Publisher:
Total Pages: 782
Release: 1995
Genre: Power resources
ISBN:

Download Energy Research Abstracts Book in PDF, Epub and Kindle

Remedial Action Plan for Stabilization of the Inactive Uranium Mill Tailings Site at Monument Valley, Arizona

Remedial Action Plan for Stabilization of the Inactive Uranium Mill Tailings Site at Monument Valley, Arizona
Author:
Publisher:
Total Pages: 202
Release: 1986
Genre:
ISBN:

Download Remedial Action Plan for Stabilization of the Inactive Uranium Mill Tailings Site at Monument Valley, Arizona Book in PDF, Epub and Kindle

This Remedial Action Plan (RAP) has been developed to serve a two-fold purpose. It presents the series of activities which are proposed by the U.S. Department of Energy (DOE) to accomplish long-term stabilization and control of radioactive materials at the inactive uranium processing site located near Monument Valley, Arizona It also serves to document the concurrence of both the Navajo Nation and the U.S. Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by DOE and the Navajo Nation and concurrence by NRC, becomes Appendix B of the Cooperative Agreement.

Remedial Action Plan and Site Conceptual Design for Stabilization of the Inactive Uranium Mill Tailings Site at Ambrosia Lake, New Mexico. Volume 1, Text, Appendices A, B, and C

Remedial Action Plan and Site Conceptual Design for Stabilization of the Inactive Uranium Mill Tailings Site at Ambrosia Lake, New Mexico. Volume 1, Text, Appendices A, B, and C
Author:
Publisher:
Total Pages:
Release: 1991
Genre:
ISBN:

Download Remedial Action Plan and Site Conceptual Design for Stabilization of the Inactive Uranium Mill Tailings Site at Ambrosia Lake, New Mexico. Volume 1, Text, Appendices A, B, and C Book in PDF, Epub and Kindle

This Remedial Action Plan (RAP) has been developed to serve a dual purpose. It presents the series of activities that is proposed by the US Department of Energy (DOE) to stabilize and control radioactive materials at the inactive Phillips/United Nuclear uranium processing site designated as the Ambrosia Lake site in McKinley County, New Mexico. It also serves to document the concurrence of both State of New Mexico and the US Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by the DOE and the state and concurrence by NRC, becomes Appendix B of the Cooperative Agreement.

Modification to the Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site at Mexican Hat, Utah

Modification to the Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site at Mexican Hat, Utah
Author:
Publisher:
Total Pages: 249
Release: 1989
Genre:
ISBN:

Download Modification to the Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site at Mexican Hat, Utah Book in PDF, Epub and Kindle

This document provides the modifications to the 1988 Remedial Action Plan (RAP) of the contaminated materials at the Monument Valley, Arizona, and Mexican Hat, Utah. The text detailing the modifications and attachments 1 through 6 are provided with this document. The RAP was developed to serve a two-fold purpose. It presents the activities proposed by the Department of Energy (DOE) to accomplish long-term stabilization and control of the residual radioactive materials (RRM) from Monument Valley, Arizona, and Mexican Hat, Utah, at the Mexican Hat disposal site. It also serves to document the concurrence of both the Navajo Nation and the Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by DOE and the Navajo Nation and concurrence by the NRC, becomes Appendix B of the Cooperative Agreement. This document has been structured to provide a comprehensive understanding of the remedial action proposed for the Monument Valley and Mexican Hat sites. It includes specific design and construction requirements for the remedial action. Pertinent information and data are included with reference given to the supporting documents.