Detailed Project Report On Navigation Improvements At Krebs Lake Channel Pascagoula Harbor Mississippi
Download Detailed Project Report On Navigation Improvements At Krebs Lake Channel Pascagoula Harbor Mississippi full books in PDF, epub, and Kindle. Read online free Detailed Project Report On Navigation Improvements At Krebs Lake Channel Pascagoula Harbor Mississippi ebook anywhere anytime directly on your device. Fast Download speed and no annoying ads. We cannot guarantee that every ebooks is available!
Author | : United States. Army. Corps of Engineers. Mobile District |
Publisher | : |
Total Pages | : |
Release | : 1982 |
Genre | : Environmental impact statements |
ISBN | : |
Download Detailed Project Report on Navigation Improvements at Krebs Lake Channel Pascagoula Harbor, Mississippi Book in PDF, Epub and Kindle
Author | : a United States. b.1 Army. b.2 Corps of Engineers. b.3 Mobile District |
Publisher | : |
Total Pages | : |
Release | : 1983 |
Genre | : Environmental impact statements |
ISBN | : |
Download Detailed Project Report on Navigation Improvements at Krebs Lake Channel, Pascagoula Harbor, Mississippi Book in PDF, Epub and Kindle
Author | : |
Publisher | : |
Total Pages | : 310 |
Release | : 1983 |
Genre | : |
ISBN | : |
Download Krebs Lake Navigation Improvements, Pascagoula Book in PDF, Epub and Kindle
Author | : United States. Army. Corps of Engineers. Mobile District |
Publisher | : |
Total Pages | : |
Release | : 1980 |
Genre | : |
ISBN | : |
Download NAVIGATION IMPROVEMENTS AT KREBS LAKE, MISSISSIPPI Book in PDF, Epub and Kindle
Author | : United States. Army. Corps of Engineers. Mobile District |
Publisher | : |
Total Pages | : |
Release | : 1980 |
Genre | : Krebs Lake (Miss.) |
ISBN | : |
Download Detailed Project Report Book in PDF, Epub and Kindle
Author | : |
Publisher | : |
Total Pages | : 564 |
Release | : 1985 |
Genre | : |
ISBN | : |
Download Pascagoula Harbor Federal Deep-draft Navigation Channel Improvement Feasibility Report Book in PDF, Epub and Kindle
Author | : United States. Army. Corps of Engineers. Mobile District |
Publisher | : |
Total Pages | : |
Release | : 1984 |
Genre | : Channels (Hydraulic engineering) |
ISBN | : |
Download Pascagoula Harbor, Mississippi Book in PDF, Epub and Kindle
Author | : |
Publisher | : |
Total Pages | : 105 |
Release | : 1992 |
Genre | : |
ISBN | : |
Download Improvement of the Federal Deep-Draft Navigation Channel, Pascagoula Harbor, Mississippi. General Design Memorandum. Main Report. Revision Book in PDF, Epub and Kindle
Project background and history. A discussion of the reformulation process and results, followed by the detailed design of the recommended plan, with general information on economics and environmental effects.
Author | : United States. Army. Corps of Engineers. Mobile District |
Publisher | : |
Total Pages | : |
Release | : 1984 |
Genre | : Environmental impact statements |
ISBN | : |
Download Feasibility Report on Improvement of the Federal Deep-draft Navigation Project, Pascagoula Harbor, Mississippi Book in PDF, Epub and Kindle
Author | : CORPS OF ENGINEERS MOBILE AL MOBILE DISTRICT. |
Publisher | : |
Total Pages | : 515 |
Release | : 1985 |
Genre | : |
ISBN | : |
Download Pascagoula Harbor, Mississippi. Feasibility Report on Improvement of the Federal Deep-Draft Navigation Channel. Volume 2. Technical Appendices. Revision Book in PDF, Epub and Kindle
The report presents the results of a feasibility study to determine if widening and/or deepening the existing Federal deep-draft navigation project would be economically justified and environmentally feasible. The plan recommended provides for deepening the existing entrance channel to 44 feet at a width of 550 feet from the gulf to the southern end of Horn Island Pass, then continuing the 44-foot depth through Horn Island Pass at a width of 600 feet. Within Mississippi Sound and into the Pascagoula River, the channel would be deepened to 42 feet at the present width of 350 feet. The existing Bayou Casotte channel would be deepened to 42 feet and widened to 350 feet and would include a new 1150-foot diameter turning basin just inside the mouth of Bayou Casotte. Mitigation for the unavoidable loss of 4 acres of emergent wetlands from the construction of the Bayou Casotte turning basin would be provided by restoring 6 acres of disturbed wetland habitat to a natural emergent nature. Construction is estimated to cost $57.3 million. Interest and amortization and future maintenance of the channel modifications amount to an annual charge of $5.4 million. Average annual equivalent benefits amount to $22.3 million, yielding a benefit-cost ratio of 4.1 to 1. Contents: Geotechnical Conditions; Design and Cost Estimates; Benefit Evaluation; Environmental Documentation; Public Involvement and Comments.