Semiannual Report to the Congress

Semiannual Report to the Congress
Author: United States. Dept. of Defense. Office of the Inspector General
Publisher:
Total Pages: 96
Release: 1995
Genre:
ISBN:

Download Semiannual Report to the Congress Book in PDF, Epub and Kindle

Defense Base Realignment and Closure Budget Data for the Relocation of Deployable Medical Systems to Hill Air Force Base, Ogden, Utah

Defense Base Realignment and Closure Budget Data for the Relocation of Deployable Medical Systems to Hill Air Force Base, Ogden, Utah
Author:
Publisher:
Total Pages: 25
Release: 1997
Genre:
ISBN:

Download Defense Base Realignment and Closure Budget Data for the Relocation of Deployable Medical Systems to Hill Air Force Base, Ogden, Utah Book in PDF, Epub and Kindle

The overall audit objective was to determine the accuracy of Defense BRAC military construction budget data. The specific objectives were to determine whether the proposed projects were valid Defense BRAC requirements; the decision for military construction was supported with required documentation, including an economic analysis; and the economic analysis considered existing facilities. We did not assess the adequacy of the management control program as part of this audit because it will be discussed in a summary report on FY 1998 Defense BRAC military construction budget data.

Defense Base Realignment and Closure Budget Data for the Construction of a Multiple Purpose Facility at Fort McCoy, Wisconsin

Defense Base Realignment and Closure Budget Data for the Construction of a Multiple Purpose Facility at Fort McCoy, Wisconsin
Author:
Publisher:
Total Pages: 26
Release: 1996
Genre:
ISBN:

Download Defense Base Realignment and Closure Budget Data for the Construction of a Multiple Purpose Facility at Fort McCoy, Wisconsin Book in PDF, Epub and Kindle

The overall audit objective was to determine the accuracy of Defense base realignment and closure military construction budget data. This report provides the results of the audit for the construction of a multiple purpose facility, valued at $3.5 million, for the closure of Naval Air Station Glenview, Illinois, and realignment of the 25th Reserve Naval Mobile Construction Battalion to Fort McCoy, Wisconsin.

Defense Base Closure and Realignment Budget Data for Williams Air Force Base, Arizona

Defense Base Closure and Realignment Budget Data for Williams Air Force Base, Arizona
Author:
Publisher:
Total Pages: 0
Release: 1993
Genre:
ISBN:

Download Defense Base Closure and Realignment Budget Data for Williams Air Force Base, Arizona Book in PDF, Epub and Kindle

The overall audit objective was to evaluate significant increases in base realignment and closure military construction project costs over the estimated costs provided to the Commission. This report provides the results of the audit of two projects valued at $6.5 million related to the realignment of the Armstrong Laboratory Simulator Research Facility (the Laboratory), Williams Air Force Base (AFB), Chandler, Arizona, to the Central Florida Research Park, Orlando, Florida, and the realignment of the Plastic Media Blast Module (the Module), Williams AFB, to Laughlin AFB, Del Rio, Texas.

Defense Base Realignment and Closure Budget Data for the Closure of Bergstrom Air Reserve Base, Texas, and Realignment of the 10th Air Force Headquarters to Naval Air Station Fort Worth, Joint Reserve Base, Texas

Defense Base Realignment and Closure Budget Data for the Closure of Bergstrom Air Reserve Base, Texas, and Realignment of the 10th Air Force Headquarters to Naval Air Station Fort Worth, Joint Reserve Base, Texas
Author:
Publisher:
Total Pages: 33
Release: 1996
Genre:
ISBN:

Download Defense Base Realignment and Closure Budget Data for the Closure of Bergstrom Air Reserve Base, Texas, and Realignment of the 10th Air Force Headquarters to Naval Air Station Fort Worth, Joint Reserve Base, Texas Book in PDF, Epub and Kindle

The overall audit objective was to determine the accuracy of Defense base realignment and closure military construction budget data. This report provides the results of the audit of one project, valued at $4.3 million, for the closure of Bergstrom Air Reserve Base, Texas, and realignment of the 10th Air Force Headquarters to Naval Air Station Fort Worth, Joint Reserve Base, Texas.