Bear Creek Restoration Project
Author | : Joe Platz |
Publisher | : |
Total Pages | : 3 |
Release | : 2012 |
Genre | : Fish habitat improvement |
ISBN | : |
Download Bear Creek Restoration Project Book in PDF, Epub and Kindle
Download Bear Creek Restoration Project full books in PDF, epub, and Kindle. Read online free Bear Creek Restoration Project ebook anywhere anytime directly on your device. Fast Download speed and no annoying ads. We cannot guarantee that every ebooks is available!
Author | : Joe Platz |
Publisher | : |
Total Pages | : 3 |
Release | : 2012 |
Genre | : Fish habitat improvement |
ISBN | : |
Author | : |
Publisher | : |
Total Pages | : 240 |
Release | : 1973 |
Genre | : |
ISBN | : |
Author | : |
Publisher | : |
Total Pages | : |
Release | : 2012 |
Genre | : Ecological assessment (Biology) |
ISBN | : |
Author | : Century Testing Laboratories, Inc |
Publisher | : |
Total Pages | : 182 |
Release | : 1980 |
Genre | : Ecological surveys |
ISBN | : |
Author | : United States. Office of the Assistant Secretary of the Army (Civil Works) |
Publisher | : |
Total Pages | : 468 |
Release | : 1998 |
Genre | : Channels (Hydraulic engineering) |
ISBN | : |
Author | : |
Publisher | : |
Total Pages | : 222 |
Release | : 2007 |
Genre | : |
ISBN | : |
Author | : Tennessee Valley Authority. Office of Health and Environmental Science |
Publisher | : |
Total Pages | : 200 |
Release | : 1972 |
Genre | : Bear Creek Project |
ISBN | : |
Author | : |
Publisher | : |
Total Pages | : 382 |
Release | : 2003 |
Genre | : |
ISBN | : |
Author | : Tennessee Valley Authority. Hydraulic Data Branch |
Publisher | : |
Total Pages | : 58 |
Release | : 1973 |
Genre | : Stream measurements |
ISBN | : |
Author | : |
Publisher | : |
Total Pages | : 22 |
Release | : 1995 |
Genre | : |
ISBN | : |
This paper presents a case study of an environmental restoration project at a major mixed waste site that poses unique challenges to remediation efforts. Bear Creek Valley is located immediately west of the Y-12 Plant on the Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee. The Y-12 Plant was built in 1943 as part of the Manhattan Project, with its original mission being electromagnetic separation of uranium. Since being completed, the Y-12 Plant has also been used for chemical processing of uranium and lithium compounds as well as precision fabrication of components containing these and other materials. Wastes containing radionuclides, metals, chlorinated solvents, oils, coolants, polychlorinated biphenyis (PCBs), and others were disposed of in large quantities at Bear Creek Valley as a result of manufacturing operations at the Y-12 Plant. The Bear Creek Valley feasibility study is using innovative strategies to efficiently and thoroughly consider the information available regarding Bear Creek Valley and process options that could be combined into its remedial alternatives.